GE M
EDICAL
S
YSTEMS
D
IRECTION
2380207
, R
EVISION
7
LOGIQ™ 5 PRO S
ERVICE
M
ANUAL
Chapter 8 Replacement Procedures
8 - 7
4.) Disconnect two connectors on the other end (4-5). Refer to Figure 8-8.
5.) Pull the Cable Assy out from the OP Rear Cover.
6.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-3-2-5
Mounting procedure
Install the new parts in the reverse order of removal.
Figure 8-8 Disconnect two(2) Connectors (5-6)
Table 8-3
Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test
Debrief Script
“Service Manual, Direction
2380207
, Rev 7+, Section 8-3-2. Equipment
passed all required tests and is ready for use. “
CRT Assy function check procedure
Functional Checks (See Also Chapter 4)
5
4
Summary of Contents for LOGIQ 5 PRO
Page 2: ...GE MEDICAL SYSTEMS DIRECTION 2407381 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL Page 1 2 ...
Page 3: ......
Page 7: ...GE MEDICAL SYSTEMS DIRECTION 2380207 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL ii iii ...
Page 462: ...GE MEDICAL SYSTEMS DIRECTION 2380207 REVISION 7 LOGIQ 5 PRO SERVICE MANUAL A 4 Index INDEX ...