GE M
EDICAL
S
YSTEMS
D
IRECTION
2317229, R
EVISION
3
LOGIQ™ 180 B
ASIC
S
ERVICE
M
ANUAL
3 - 6
Section 3-2 - Receiving and Unpacking the Equipment
3-2-2
Packing Procedure
1.) Clean the system, then make the preparation as below:
a.) Put the top cover sheet on the system top cover.
b.) Cover the ten caps on the side cover.
c.) Clean the caster, power cord.
d.) Check the accessories based on checklist.
Figure 3-11 Packing procedure (1)
Top cover sheet
Top cover