background image

14

Installation Instructions

Check to make sure the circuit breaker is closed (Reset) or the circuit fuses are
replaced.

Be sure power is in service to the building.

Check to be sure that all packing materials and tape on metal panel (if applicable)
under control knobs and drawer have been removed.

Final Checklist

Check to make sure the Clock display is energized. If a series of horizontal red lines
appear in the display, disconnect power immediately. Recheck the range wiring
connections. If change is made to connections, retest again. If no change is required,
have building wiring checked for proper connections and voltage. It is recommended
that the clock be changed if the red lines appear.

Push down and turn any one of the four surface knobs to “MED” setting to observe
that the element glows within 15 seconds. Turn the knob off when glow is detected.
If the glow is not detected within the time limit, recheck the range wiring connections.
If change is required, retest again. If no change is required, have building wiring
checked for proper connections and voltage.

Operation Checklist

Summary of Contents for JS905

Page 1: ...IMPORTANT Observe all governing codes and ordinances Note to Installer Be sure to leave these instructions with the consumer Note to Consumer Keep these instructions for future reference Proper insta...

Page 2: ...t 5 beyond the front of the cabinets Cabinets installed above a cooktop must be no deeper than 13 Be sure your appliance is properly installed and grounded by a qualified technician WARNING To reduce...

Page 3: ...ntertop and range cooktop may occur Forcing the cooktop to fit may cause excessive gaps and could break the glass and void the warranty Continued on following page Installation Instructions Pre Instal...

Page 4: ...the door on its handle This could cause dents or scratches Place hands on both sides of the door and close the oven door to the removal position This is half way between the broil stop and fully clos...

Page 5: ...the range see Alternate Construction section AF on page 16 30 ranges conform to U L requirements for 0 spacing from vertical walls below countertops Allow 1 4 minimum clearance at the back wall above...

Page 6: ...and voiding the warranty Center the 30 wide opening over the adjacent cabinets and mark with a straight edge Using a straight edge mark the back line at 23 3 16 from the front edge of the counter Be...

Page 7: ...e leads on the junction block ELECTRICAL REQUIREMENTS CAUTION For personal safety do not use an extension cord with this appliance Remove house fuse or open circuit breaker before beginning installati...

Page 8: ...gh the strain relief and tighten Allow enough slack to easily attach the cord terminals to the terminal block If tabs are present at the end of the winged strain relief they can be removed for better...

Page 9: ...e supply circuit must be connected to the neutral terminal located in the lower center of the terminal block The power leads must be connected to the lower left and the lower right terminals of the te...

Page 10: ...t Conduit B Skip to Step 8 and proceed with the installation 7 4 WIRE CONDUIT INSTALLATION A Loosen the three lower terminal screws from the terminal block Remove the ground screw and ground plate and...

Page 11: ...les in each Install the sleeve anchors into the predrilled concrete holes and install the lag and wall screws through the Anti Tip bracket Make sure the screws are securely tightened To Front Edge of...

Page 12: ...in the front two leveling legs similar to E until the glass overhang touches the countertop Carefully push the range into the opening until the countertop fully engages the control panel The back glas...

Page 13: ...Bottom Edge of Slot Hinge Arm Hinge Notch Notch of Hinge Securely Fitted into Bottom of Hinge Slot Hinge in Locked Position Place the drawer rail on the guides Push the drawer in until it stops Lift t...

Page 14: ...diately Recheck the range wiring connections If change is made to connections retest again If no change is required have building wiring checked for proper connections and voltage It is recommended th...

Page 15: ...rd kit refer to the backguard kit instructions for installation details AA If you use the filler kit place the metal filler piece supplied with the range to the back of the range as shown in the figur...

Page 16: ...from the front of the countertop Be aware that the screws provided are long and may penetrate through the back of the island cabinets In this event use shorter screws not provided or the screws provid...

Page 17: ...17 NOTES...

Page 18: ...18 NOTES...

Page 19: ...19 NOTES...

Page 20: ...20 NOTES...

Reviews: