17
TOOLS AND MATERIALS
YOU WILL NEED
•
Saw
•
Duct tape
•
Measuring tape or scale
•
Carpenter’s square
•
Adjustable wrench or socket set (7/16
″
socket and
ratchet)
•
Drill and drill bit
•
1/4
″
nut driver
•
Sheet metal screws
•
Pipe wrench
•
Manual gas line shut-off valve
•
Pipe joint sealant that resists action of LP gas
•
Ductwork to suit the installation
For rigid connection:
•
Shut-off valve
•
Union
•
Pipe fittings as required
For flexible connection where local codes permit:
•
Flexible metal tubing (same 3/4
″
or 1/2
″
I.D. as gas
supply line)
21
7
⁄
8
″
20
1
⁄
2
″
22
″
29
7
⁄
8
″
2
1
⁄
4
″
28
3
⁄
4
″
30
″
COOKTOP (DIMENSIONS FOR REFERENCE ONLY)
Unit shown fully assembled.
Unit must be vented to the outside!
Installation Instructions
PREPARATION