17
CL
CL
To accurately locate the ductwork holes in
the cabinet floor:
• Place the downdraft vent against the back of
the cutout.
• Place the transition duct supplied on top of the
blower/motor assembly.
• Position the transition duct and assembly
below the discharge outlet.
• Position a transition duct (not supplied) to the
end of the blower in the direction of desired
discharge.
• Mark the location and remove the assembly.
• Cut the holes and install ductwork connection.
Through the floor shown with rectangular duct
(not shown to scale)
Discharge left shown with rectangular duct
(not shown to scale)
Discharge right shown with 6
″
round duct
(not shown to scale)
(continued next page)
10
5
⁄
16
″
1
1
⁄
4
″
From
back wall
1
1
⁄
4
″
From
back wall
1
1
⁄
4
″
From
back wall
3
1
⁄
4
″
x 10
″
3
1
⁄
4
″
x 10
″
3
1
⁄
4
″
x 10
″
10
5
⁄
16
″
7
1
⁄
16
″