GE MDS Intrepid-HC HP Commissioning Log
The Commissioning Log is an integral part of the commissioning procedure and should be filled in for each
installed link.
The Commissioning Log gathers all relevant information regarding the installed link and contains a checklist of
all recommended commissioning tests.
Maintaining the Commissioning Log is important for tracking your installations, and to provide essential data
for your Networks.
Upon completing the Commissioning Log, store it in a safe place where it can be accessed for possible
troubleshooting needs.
GE MDS
Intrepid-HC HP LINK COMMISSIONING LOG
1. GENERAL INFORMATION
Customer:
Radio model:
Configuration:
Radio link code:
Site 1 name
&
add:
Site 2 name
&
add:
2. IN-DOOR UNIT
Site 1 Drawers
Right / Left
Site 2 Drawers
Right / Left
IDC model:
Wayside channel:
IDC p/n:
IDC s/n:
SW IDC:
Drawer model
Main channel
Drawer p/n
Drawer s/n
FW Mux:
FW Modem:
Cfg Modem:
Summary of Contents for HC HP
Page 2: ......
Page 6: ......
Page 42: ...GE MDS Intrepid HC HP Installation Guide 1 36 ...
Page 98: ...A 6 GE MDS Intrepid HC HP Installation and Operation ...
Page 100: ...B 2 GE MDS Intrepid HC HP Installation Guide ...