NE-M Installation Guide
H5692448
850050111
Issue 03 August 2017
61
Verify Rectifier Positions
Refer to site engineering instructions for rectifier type per position.
Step
Action
1
Verify that proper rectifiers are installed in all powered rectifier positions.
2
Verify that rectifiers in all DC powered positions have
Eco
type badges
3
Verify that rectifiers in all DC powered positions are displayed with the
Eco
leaf in the ECO Support column on
the controller web Inventory report screen – Figure 84.
4
Verify that rectifiers in all DC powered positions are displayed with the “
Eco
leaf” in the controller web main
screen
Figure 84 Inventory Screen
Figure 85 Main Screen - web
24
RECOMMENDED
– Eco rectifiers in all Eco system rectifier positions (AC and DC powered).
NOT RECOMMENDED
– Non-Eco rectifiers may be installed in AC powered positions of Eco systems.
Use of non-Eco rectifiers in Eco systems increases the risk of improperly filling system rectifier positions.
25
The “Eco leaf” displays for rectifier positions after being DC powered while connected to the controller.
All populated rectifier positions are reported as AC powered until DC input is applied.
Eco type rectifiers display the Eco leaf
AC Powered
Rectifier Capacity
DC Powered
Eco leaf symbols Indicate
DC Powered Rectifiers