GE H
EALTHCARE
D
IRECTION
5394141, R
EVISION
5
LOGIQ™ P5 S
EVICE
M
ANUAL
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8-53
8-2-16
Side Right Cover
8-2-16-1
Tools
•
Common pilIips screwdrivers
8-2-16-2
Preparations
•
Shut down the system and switch off the main breaker.
8-2-16-3
Removal procedure
1.) Unscrew 2 screws (1-2).
2.) Remove the Right cover.
3.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-16-4
Mounting Procedure
Install the new parts in the reverse order of removal.
Figure 8-86 2 screw on side right cover
Figure 8-87 Open side right cover
Table 8-17 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test
Debrief Script
“Service Manual, Direction
5394141, Rev 1+, Section 8-2-16. Equipment
passed all required tests and is ready for use. “