7.4 Troubleshooting.
Switching ON is not possible.
A) Closing drive doesn't operate electrically but it is still
possible to close the breaker manually by mean of the
hand lever.
1) Check the supply voltage of the drive (-X2 :1/:2). The
voltage shall not be less than 80% of drive’s rated
voltage.
2) Check the supply voltage of the controls (-X3 :4/:5).
The voltage shall not be less than minimum input
voltage required for installed voltage converter
3) Calculate the voltage drop at both supply lines and
check cables cross section.
4) Check the polarity of the supply connections.
5) Check continuity of the control connections.
Open the control box:
WARNING !
Below operations are done with control
voltage connected. Only trained specialist or GE Ser-
vice representative shall execute it.
Risk of electric
shock!
6) Check if the PCBs’ plugs are connected and screwed.
7) Check if there is 24VDC available at output of the
voltage converter. Check -X10 (:8:9:10) / (:6:7).
8) Check the status of the red LED diode on the SU PCB.
-
Does not light – power supply failure;
-
Weak light – system ready to CLOSE;
-
Intensive red light – system not ready to CLOSE.
Emergency STOP circuit is broken, or NEKO PCB is
not charged, or “anti-pumping” is active for 15 sec.
9) Check if the emergency STOP circuit is not open.
Measure voltage at SU PCB, (-X12 5:/:6). There shall
be ~24VDC available for actuation of “closing stop re-
lay”. If there is no 24VDC, check continuity of emer-
gency STOP circuit. Check relays at ST/UVR/NEKO
PCBs, by controlling state of contacts at points :5/:6
of each.
10) Replace any ST/UVR/NEKO if necessary.
11)
12) Replace the SU control PCB.
13) Switch OFF the power at control box! Check continu-
ity and resistance of solenoid winding. Replace the
solenoid in case of winding breakage.
Contact GE Service in case the problem is not solved.
B) Closing drive operates electrically, but it is not pos-
sible to keep contacts closed.
1) Check the forced tripping release (if installed). Per-
manently blocked tripping device, during closing op-
eration, will effect with mechanism failure and con-
tacts opening.
2) Check contact system area. Look for any part is stuck
between contacts or into mechanism module.
3) If the zero voltage release is installed in, please check
connection of (–S2) pushbutton. If only NO type (-X2
:6/:7) is used, be sure that (–X2 :8/:9) is shorted.
Open the control box (only when UVR is installed).
4) Check the wiring connections for UVR PCB.
5) Check supply of the UVR control PCB (-X13 :7/:8)
Contact GE Service in case the problem is not solved.
Switching OFF is not possible.
WARNING!
Below operations are done with control
voltage connected. Only trained specialist or GE Ser-
vice representative shall execute it.
Risk of electric
shock!
A) Shunt trip does not operate. Breaker is able to CLOSE
and OPEN by means of hand lever.
1) Check points A2 to A5.
2) Check the self cut off contact HS11 (-X14 :1/:2).
3) Check the wiring connections and supply line of ST
PCB (-X14 :7/:8).
4) Check the continuity of shunt trip’s coil (-X14 :9/:10).
5) Replace the ST PCB or ST coil if necessary.
Contact GE Service in case of problem is not solved.
B) Zero voltage release does not operate. Breaker is
able to CLOSE and OPEN by means of hand lever.
1) Check points A2 to A5.
2) Check point B3 to B5.
3) Check the continuity of UVR’s coil (-X13 :9/:10).
4) Replace the UVR PCB or UVR coil if necessary.
Contact GE Service in case the problem is not solved.
C) ED tripping device does not operate. Breaker is able
to CLOSE and OPEN by means of hand lever.
5) Check points A2 to A5.
6) Check the wiring connections and supply line for
NEKO PCB (-X16 :1/:2).
7) Check the voltage level and timing of firing signal for
releasing the C-bank energy (-X16 :3/:4). Voltage sig-
nal shall be between 6-24VDC and duration of mini-
mum 3ms.
8) Check if the NEKO is signalling C-bank charging cor-
rectly (-X16 :9/:10). Relays is closed when NEKO is
ready to operate.
9) Check the continuity of ED coil (-X16 :11/:12).
10) Replace the NEKO PCB if necessary.
Contact GE Service in case the problem is not solved.