GE ecomagination Profibus DP AF-650 GP Instruction Manual Download Page 9

1.11 Abbreviations

ACI

Acyclical Control Interval

AOC

Application Orientated Controller

CAN

Controller Area Network

CTW

Control Word

DP

Distributed Periphery

DU

Data Unit

EEPROM

Electrical Erasable Programmable Read Only Memory

EIA

Electronic Industries Alliance: Specifier of the EIA Standard RS 485-A

EMC

Electromagnetic Compatibility

FDT

Field Device Tool

IND

Sub index

ISO

International Standards Organization

LCD

Liquid Crystal Display

LED

Light Emitting Diode

MAV

Main Actual Value

MC1

Master Class 1

MC2

Master Class 2

MOC

Motion Orientated Controller

MRV

Main Reference Value

NDL

Network Data Link Layer

PB

PROFIBUS

PC

Personal Computer

PCD

Process Data

PCA

Parameter Characteristics

PCV

Parameter-Characteristics-Value

PDU

Protocol Data Unit

PLC

Programmable Logic Control

PNU

Parameter Number

PPO

Parameter-Process Data

PVA

Parameter Value

RC

Request/Response Characteristics

SAP

Service Access Point

SMP

Spontaneous Message

STW

Status Word

AF-650 GP/AF-600 FP Profibus DP Instruction Manual

1-6

DET-624

1  

Summary of Contents for ecomagination Profibus DP AF-650 GP

Page 1: ...tion with installation operation or maintenance Should further information be desired or should particular problems arise which are not covered sufficiently for the pur chaser s purposes the matter sh...

Page 2: ...stable Frequency Drive 4 1 PPO Types 4 1 Process Data 4 3 Reference Handling 4 3 Process Control Operation 4 5 Control Profile 4 5 PROFIdrive Control Profile 4 5 GE Drive Control Profile 4 11 Synchron...

Page 3: ...tatus 8 1 No Communication with the Drive 8 2 Warning 34 Appears even though Communication is Established 8 3 Drive Will Not Respond to Control Signals 8 3 Alarm and Warning Words 8 6 Fault Messages v...

Page 4: ...ational and local rules and safety regulations must be complied with 1 2 2 Safety Regulations 1 The adjustable frequency drive must be disconnected from line power if repair work is to be carried out...

Page 5: ...users can obtain the most essential information for quick installation and set up in these chapters Introduction How to Install How to Configure the System Application Examples For more detailed info...

Page 6: ...twork efficiency Easy to use transparent installation diagnostics and parameterization Flexibility and compatibility Two different state machines can be selected PROFIdrive profile or GE Drive profile...

Page 7: ...2 connection Support of standard interfaces COMx USB RS232 FLUX Siemens PG Field PGs already have the necessary hardware View is highly configurable 1 6 Technical Overview 1 6 1 Network Topology Sing...

Page 8: ...d supporting all the PROFIBUS communication services required by your application and that all requirements stipulated in the PROFIBUS standard as well as those set up in the PROFIBUS Variable Speed D...

Page 9: ...ation LCD Liquid Crystal Display LED Light Emitting Diode MAV Main Actual Value MC1 Master Class 1 MC2 Master Class 2 MOC Motion Orientated Controller MRV Main Reference Value NDL Network Data Link La...

Page 10: ...ly Maximum total network cable length Transmission speed 1 segment 32 nodes 31 drives m 2 segments 64 nodes 1 repeater 61 drives m 3 segments 96 nodes 2 repeaters 91 drives m 4 segments 128 nodes 3 re...

Page 11: ...eld also at high frequencies This can be obtained by connecting the surface of the shield to ground for example by means of a cable clamp or a conductive cable connector The adjustable frequency drive...

Page 12: ...ated When power to the Profibus DP Communications Module is down please note that the termination is still active although not func tional Most masters and repeaters are equipped with their own termi...

Page 13: ...130B1112 AF 650 GP AF 600 FP Profibus DP Instruction Manual 2 4 DET 624 2...

Page 14: ...ame located beneath and discard Push the module into place Two positions are possible with cable terminal facing either up or down The cable up position is often most suitable when several adjustable...

Page 15: ...AF 650 GP AF 600 FP Profibus DP Instruction Manual 2 6 DET 624 2...

Page 16: ...t at the next power up and can be read in PB 18 Node Address Note the location and sequence of the hardware switches as illustrated in the figure opposite Setting the PROFIBUS Address via PB 18 Node A...

Page 17: ...first step in configuration of the PROFIBUS master is to import the GSD file in the configuration tool The steps outlined below show how to add a new GSD file to the Simatic Manager software tool For...

Page 18: ...BUS master system Select AF 6 Series then drag and drop it onto the PROFIBUS in the hardware diagram A window for the address of the AF 6 Series now appears Select the ad dress from the scroll down li...

Page 19: ...e For Profibus SW version 2 x and higher auto configuration of process data is supported This feature makes it possible to configure the process data PB 15 PCD Write Configuration and PB 16 PCD Read C...

Page 20: ...Coasting Select to O 56 Preset Reference Select will be overruled and all act on bus control O 03 Control Word Time out Time to O 05 End of Time out Function The reaction in the event of a network ti...

Reviews: