g
GE
OPM_SGS_ISG_10K_40K_0US_V010.doc
30/45
Installation
Guide
SG Series
10, 20, 30 & 40 kVA
Notices for installation
S
G
T
5
000_010-
02
0_UP
S
B
R
1-
2-
3_01
X2
X1
BR2
BR1
BR3
Fig. 3.8.4-2 Interconnection links BR1, BR2 and BR3 of
SG Series
10 and 20 kVA
For separate
Bypass
and
Rectifier Input
configuration, the interconnection links
BR1
,
BR2
and
BR3
must be removed
.