background image

STEP 7 

Reinstalling Cover 

Reinstall  plastic  breaker handle and shutter.  Position  the  wires  to 

match  the  wire  exiting  hole  in  the  cover  as  shown  in  Figure  9. 

Make  sure  no  wires  are  pinched  in  the  routing. 
Wires  must  pass through  the  cover  notch  as  shown  in  Figure 

10. 
Make  sure  the  cover  is  properly  seated  and  tighten  the 

four  inner  cover

 

mounting  screws  to  torque  value  of  12-15 

Lb-in  and  two outer mounting screws to 18-22 Lb-in.

Figure 9. 

Figure 10. 

While  dropping  down  the  UVR  in  the  right  pole,  make 

sure that  the UVR reset arm is properly relieved and made 

to  rest  on  the  handle  “L”  bend  extension  provided  as 

shown  in  the figure  8. 

UVR Reset Arm 

Handle 

 

Yoke 

“L” Bend 

Figure 8. 

Figure 7. 

3

STE

 

P 6 

INSTALLATION 

Drop  down  the  UVR  in  the  right  pole  in  locating  holes 

provided in Base as shown Figure 7. 

Be  absolutely  sure  to  reinstall  parts  in  their  proper 

location which are accidentally removed from the breaker. 

Summary of Contents for DEH41552

Page 1: ...uiring cover removal of a sealed breaker voids UL listing The UL label must be destroyed 2 UVR cannot be installed in breakers code dated with this numberor lower 101 STEP 2 Removing Cover Remove breaker cover by removing cover screws as shown in Figure 3 Tar must be removed and discarded to gain access to screw Remove and save plastic handle and shutter Push trip bar towards load end to trip mech...

Page 2: ...ie bar and its mounting screws Figure 6b STEP 3 Cover Modification for Wire Exiting Perform cover modification as shown in Figure 4 Remove all debris LINE END LINE END CUT NOTCH IN RIGHT SIDE LOAD END LOAD END BARRIER SUPPLIED WITH KIT REMOVAL OF EXISTING BARRIER Figure 6a 5b Installationof Phase Barrierfor UVR Assemblethe Phase barriersupplied with kit as shown in Figure6b 2 Figure 4b Side View o...

Page 3: ...ews to torque value of 12 15 Lb in and two outer mounting screws to 18 22 Lb in Figure 9 Figure10 While dropping down the UVR in the right pole make sure that the UVR reset arm is properly relieved and made to rest on the handle L bend extension provided as shown in the figure 8 UVR Reset Arm Handle Yoke L Bend Figure8 Figure7 3 STEP 6 INSTALLATION Drop down the UVR in the right pole in locating h...

Page 4: ...respective Voltage Rating in the check Box provided in theRating label to be offered to Customer Rating Label Figure 12 Figure 11 Line and Load Labels Paste the Line and Load Labels on the top of the Cover as shown in the Figure 12 Align horizontal bottom edge of Rating Label with the barcode label top edge Align vertical edge of the Rating Label with the Base vertical edge reference 4 1SQC930043M...

Reviews: