background image

DEH41552 INSTALLATION INSTRUCTION FOR RIGHT POLE MOUNTING ONLY

Under

v

oltage Release Device 

 

ELECTRICAL DATA

 

Cat No. 

(Right Pole Only) 

Rated 

Voltage 

MA Current

 

Dc 

Ac 

TEYXU1 

24V Ac 

--- 

100 

TEYXU2 

48V Ac 

--- 

50 

TEYXU3 

120V Ac 

--- 

17 

TEYXU4* 

240V Ac 

--- 

10 

TEYXU6 

24V Dc 

100 

--- 

TEYXU7 

48V Dc 

50 

--- 

TEYXU8 

125V Dc 

18 

--- 

TEYXU9* 

250V Dc 

11 

--- 

Figure 1. 

CAUTION:

  The  device  is  factory  installed  in  the  right 

pole only. Before inspecting or  beginning any maintenance 

works  on  the  breaker,  it  must  be  dis connected   from  all 

voltage

 

sources,  both  power  and   control,  an d  breaker 

placed  in th e  off  (open ). 

Fig ure 2. 

NOTES: 

1.A ny  work  r equiring  cover  removal  of  a  sealed breaker 

voids 

UL 

listing. The 

UL

 label must be destroyed.

2 . 

UVR

  can

n

ot  be  installed in  bre akers code   dated  with 

this numb er o

lower: 

10

 

1

 

STEP 

 

Removing Cover 

Remove  breaker  c over  by  re moving  cover  screws   as  shown 

in  Figure  3.  Tar  must  be  removed  and  discarded  to  gain 

access  to

  screw.  Remove  and  save  plastic  handle  and  

shutter. 

Push trip bar towards load end to trip mechanism.

 

*Rated  UVR  coils  includes  externally  serious  mounted 

resistor.

D

 

ESCRIPTION 

T his  device  is  used  for  automatic  breaker  tripping  when 

line voltage drops below a pre-determined level. 

STEP 1 

 

Breaker 

 

Preparation for Field Installation.

Open  breaker  contac

ts

  by  moving  handle  to  the breaker 

“OFF” position as shown in Figure 2. 

Figure 3. 

1

This accessory to  be installed in Right Pole only. 

Summary of Contents for DEH41552

Page 1: ...uiring cover removal of a sealed breaker voids UL listing The UL label must be destroyed 2 UVR cannot be installed in breakers code dated with this numberor lower 101 STEP 2 Removing Cover Remove breaker cover by removing cover screws as shown in Figure 3 Tar must be removed and discarded to gain access to screw Remove and save plastic handle and shutter Push trip bar towards load end to trip mech...

Page 2: ...ie bar and its mounting screws Figure 6b STEP 3 Cover Modification for Wire Exiting Perform cover modification as shown in Figure 4 Remove all debris LINE END LINE END CUT NOTCH IN RIGHT SIDE LOAD END LOAD END BARRIER SUPPLIED WITH KIT REMOVAL OF EXISTING BARRIER Figure 6a 5b Installationof Phase Barrierfor UVR Assemblethe Phase barriersupplied with kit as shown in Figure6b 2 Figure 4b Side View o...

Page 3: ...ews to torque value of 12 15 Lb in and two outer mounting screws to 18 22 Lb in Figure 9 Figure10 While dropping down the UVR in the right pole make sure that the UVR reset arm is properly relieved and made to rest on the handle L bend extension provided as shown in the figure 8 UVR Reset Arm Handle Yoke L Bend Figure8 Figure7 3 STEP 6 INSTALLATION Drop down the UVR in the right pole in locating h...

Page 4: ...respective Voltage Rating in the check Box provided in theRating label to be offered to Customer Rating Label Figure 12 Figure 11 Line and Load Labels Paste the Line and Load Labels on the top of the Cover as shown in the Figure 12 Align horizontal bottom edge of Rating Label with the barcode label top edge Align vertical edge of the Rating Label with the Base vertical edge reference 4 1SQC930043M...