background image

Becker HPP-5 High Pressure Positioner Maintenance and Operation Manual  |  10

© 2014 General Electric Company. All rights reserved.

HPP-5 Positioner Appendix

SEE FIG.1

FIG. 2

FIG. 1

SEE FIG.2

5

3

4

SPRING CARTRIDGE 25-1009

FOR HPP

-SB

SP

ACER

(25-8145)

1/2-20 HEX  JAM NUT (98-3056)

SP

ACER

(50-1283)

3/8 I.D

LOCK

W

ASHER

(98-2782)

3/8 FLA

WA

SHER

(98-2780)

3/8-16 X 1 1/4 HHCS   (98-2583)

ADJUSTING SCRE

W

(25-1035)

(FOR SPLIT RANGE)

BIAS SPRING

5

4

3

SPLIT RANGE C

ONVERSION

ASSEMBL

Y    30-0503

CYLINDER

12

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

NO

TES:

1) REGULA

TOR 

TO

 OPEN ON INCREASING

   SIGNAL

20

3) ASSY

. IS SHOWN 

WITH REGULA

TOR IN

   FULL CL

OSED POSITION.

2) SEE DRA

WING #30-1207 FOR 

   CL

OSE ON INCREASING SIGNAL.

21

RO

D

CLEVIS

HOUSING ASSY

.

INSTRUMENT GA

UGE

HPP

09-13-93

NT

S

TS

DRA

WING NUMBER

APPR0VED    

BY

:

B

DWG. SIZE

REVISED 

BY

: DB

REVISED 

DA

TE: 2/12/04

DRA

WN 

BY

DA

TE:

SCALE:

30-1208

ITEM

QT

Y.

PA

RT#

DESCRIPTION

1.

1

95-2643

O

-RING-24

2.

1

25-1095

SPRING RE

TAINER

3.

1

95-2644

O

-RING-30

4.

1

25-1289

SHORT 

TUBING

5.

1

TUBE HOLDER

6.

1

25-1310

AC

CESS C

OVER

7.

1

25-1131

BO

TT

OM C

OVER

8.

1

25-1230

8" STK

. HPP

-2 BO

X

9.

1

98-2500

7/16-20 JAM NUT

10.

1

25-1141

STUD

11.

1

01-2509

RE

TAINING SCRE

W

ITEM

QT

Y.

PA

RT#

DESCRIPTION

12.

1

25-1334

8" STK

. T

OP BO

X

13.

1

25-1149

RANGE SPRING L

OCK

14.

1

98-3171

8-32 X 1/4 RHMS

15.

1

50-1230

RANGE SPRING

16.

1

FLANGE

17.

1

50-1220

8" STK

. LEXAN C

OVER

18.

1

INDIC

AT

OR BAR

19.

1

25-1336

8" STK

. GUIDE BAR

20.

1

25-1311

POS. MT

G. BRA

CKE

T

21.

1

25-1412

LIMIT SWIT

CH C

OVER

BECKER 

Pr

ecision

Equipmen

t

DRESSER INC.

HPP

-OI-8-SR-SPL

8" STK

. HPP ASSEMBL

Y

25-1133

Summary of Contents for Becker HPP-5

Page 1: ...GE Oil Gas GE Data Classification Public HPP 5 High Pressure Positioner Installation and Maintenance Manual ...

Page 2: ...ower pressure downstream or fuel gas system eliminating bleed gas completely This means significant savings because it limits expensive bleed gas and decreases the environmental impact of atmospheric hydrocar bons on diminishing natural resources Description The Becker HPP 5 positioner is used in control valve assemblies with a controller or I P transducer and double acting actuator to provide acc...

Page 3: ...t GE for additional information Retrofit Compatibility Excellent performance is achieved by pairing the HPP 5 positioner with genuine GE control valve actuators Should you already have existing control valve actuator s in service the addition of a Model HPP 5 positioner can improve performance and eliminate atmospheric bleed emissions if using the BPS Bleed to Pressure System feature Some Compatib...

Page 4: ...the supply and discharge pressures In steady state the forces imposed on the balance beam by the input signal diaphragm and the range spring are equal therefore the top and bottom balance valves in the positioner are at or near their closed positions The cylinder top and bottom pressures are both equal to power gas pressure and the control valve is stationary An increase in the input signal pressu...

Page 5: ...greater accuracy from a smaller deadband and minimal bleed gas Your HPP 5 positioner will come factory adjusted for your particular application The use of the adjustment procedures will be necessary upon installation of a rubber goods replacement kit or any other disassembly or reassembly of the positioner Adjustment Procedure The sensitivity adjustment drum on one end of the positioner determines...

Page 6: ...ual position If the actuator is not equipped with an MCV 3 manual control valve use the block valve 1 4 inch ball valve installed between the positioner output and the actuator Once the actuator has reached its desired position based on the mid signal applied to the instrument port Step 5 place the block valve in the closed position 7 Final Sensitivity Drum Adjustment for positioner s bleeding to ...

Page 7: ... the start of the valve travel continue increasing the instrument signal until the valve stroke is completed and the cylinder output gauges show full power gas pressure differential 2 Be sure not to overshoot at this point as any signal level above this upper limit will show the same reading on the cylinder gauges This point is the highest end of the range and the value may not necessarily be equa...

Page 8: ...ge spring was sent with the kit remove the existing range spring and replace it with the new one 6 Adjust the unit per the Adjustment Procedures Stroke With Transmitter Without Transmitter 4 25 1402 25 8001 6 25 8136 25 1093 8 25 1402 25 1423 NOTE Refer to Table 1 and Table 2 for bias and range spring part numbers Table 5 Split Range Conversion Kits Maintenance and Inspection As with all precision...

Page 9: ...des adequate preventative maintenance Parts Ordering The following is provided to allow the ordering of replacement parts Please specify the Becker instrument serial number when ordering parts this can be found on the stainless steel tab attached to the pilot by the 7 16 hex head cap screws If the instrument was supplied as a complete valve regulator package the stainless tag attached to the actua...

Page 10: ...ORIFICE ASSY 7 1 35 1519 SEAT COVER 8 1 98 3056 1 2 20 JAM NUT SS 9 1 25 1124 BEAM ADJUSTING DRUM 10 1 25 1213 DIAPHRAGM 11 6 95 2609 O RING 010 12 1 25 1065 1 2 20 SPECIAL NUT ALUM 13 1 98 2950 1 8 ROLL PIN SS 14 4 98 3144 8 32 x 1 SHCS 15 1 25 1086 BEAM BLOCK 16 1 35 1506 OUTSIDE PISTON 17 4 98 3089 3 16 x 1 2 ROLL PIN SS 18 4 98 3180 1 4 20 x 2 1 2 HHCS 19 1 35 1013 GAUGE MANIFOLD 20 6 95 2615 ...

Page 11: ...E ON INCREASING SIGNAL 21 ROD CLEVIS HOUSING ASSY INSTRUMENT GAUGE HPP 09 13 93 NTS TS DRAWING NUMBER APPR0VED BY B DWG SIZE REVISED BY DB REVISED DATE 2 12 04 DRAWN BY DATE SCALE 30 1208 ITEM QTY PART DESCRIPTION 1 1 95 2643 O RING 24 2 1 25 1095 SPRING RETAINER 3 1 95 2644 O RING 30 4 1 25 1289 SHORT TUBING 5 1 TUBE HOLDER 6 1 25 1310 ACCESS COVER 7 1 25 1131 BOTTOM COVER 8 1 25 1230 8 STK HPP 2...

Page 12: ... POSITION 2 THE ORIFICE ASSEMBLY IS CALIBRATED TO ASSURE EQUAL RATE OF FLOW FROM BOTH ORIFICES 1 REGULATOR TO CLOSE ON INCREASING SIGNAL N0TES HPP INSTRUMENT GAUGE BECKER Precision Equipment DRESSER INC ITEM QTY PART DESCRIPTION 1 1 50 1230 FLANGE 2 1 25 1310 ACESS COVER 3 1 98 3171 8 32 X 1 4 RHMS 4 1 25 1149 RANGE SPRING LOCK 5 1 RANGE SPRING 6 1 95 2643 O RING 024 7 1 25 1134 LONG TUBING 8 1 95...

Page 13: ...b Insert the balanced valve assembly C with the stem facing downward 1c Insert the second balanced valve assembly C with the stem facing upward 1d Insert the second strainer D1 and spacer D assembly 1e Insert the top seat rubber facing downward E 1f Secure the seat assembly to the pilot body block F with two washers C1 seat cover B and two flat head machine screws A NOTE Install washers to compens...

Page 14: ...h four 1 4 20 x 2 1 2 inch stainless steel hex head cap screws J by lining it up with roll pins M in pilot body block F Step 4 Test the pilot body block F for leakage Using 1 4 inch NPT plugs plug the orifice block ports K and the gauge manifold N 4a Connect a pressure source to the orifice block K as shown Use approximately 100 psig for testing 4b With the pressure source activated soap test arou...

Page 15: ...ly with two 8 32 x 1 inch SHCS T Step 6 Slide 012 O ring CC onto the outside piston I and into the groove near its base 6a Install one washer Z onto the shaft of the outside piston I with the grooves facing upward 6b Install the convoluted diaphragm AA onto the shaft of the outside piston as shown 6c Install one washer Z onto the shaft of the outside piston with the grooves facing downward 6d Tigh...

Page 16: ...ith six 1 4 20 x 3 4 inch hex head cap screws DD Align holes in the beam spacer JJ and in the beam adjusting drum KK as shown Step 10 Screw the beam drum KK on to the piston F until it stops Then turn the beam drum the opposite direction until the slot in the beam drum aligns with that of the beam spacer Step 11 Place the beam NN inside the beam block LL in the direction shown and then place the 1...

Page 17: ...Becker HPP 5 High Pressure Positioner Maintenance and Operation Manual 16 2014 General Electric Company All rights reserved ...

Page 18: ... ...

Reviews: