© 2019 Baker Hughes, a GE company, LLC. All rights reserved.
Masoneilan SVi1000 Positioner Quick Start Guide
=
|
31
Step 2: Connecting the Tubing and Air Supply
To connect the air supply:
1. Install the tubing to the air supply port. Minimum tubing diameter 1
⁄
4" (Figure 17).
Figure 17
Air Ports
2. Pipe the output air from the output pressure port to the actuator. Minimum tubing
diameter: 1/4".
NOTE
The SVi1000 is designed to operate with clean, dry, oil-free,
instrument grade air to ANSI-ISA-57.3 1975 (R1981) or
ISA-S7.3-1975 (R1981).
Actuator
Conduit
Connection
Supply
Connection
1/4" NPT
1/4" NPT
Connection
Summary of Contents for BAKER HUGHES Masoneilan SVi 1000
Page 1: ...Masoneilan SVi 1000 Positioner Quick Start Guide Rev L BHGE Data Classification Public...
Page 8: ...This page intentionally left blank...
Page 18: ...This page intentionally left blank...
Page 38: ...This page intentionally left blank...
Page 56: ...This page intentionally left blank...
Page 86: ...This page intentionally left blank...
Page 87: ......