![GE AKTAprocess Site Preparation Manual Download Page 10](http://html1.mh-extra.com/html/ge/aktaprocess/aktaprocess_site-preparation-manual_4080661010.webp)
Mains and neutral conductor
minimum area
Mains current
up to
16 AWG or 1.5 mm
2
10 A
14 AWG or 2.5 mm
2
16 A
12 AWG or 4 mm
2
25 A
Computer requirements
An external computer is not required. ÄKTAprocess is provided with a built-in industrial
computer.
User-supplied accessories and
consumables
The following equipment must be supplied by the user:
Specification
Tool
Used for unpacking the system
13 mm wrench (or ratchet
wrench with 13 mm socket)
Used for unpacking the system
Electrical TX25 screwdriver or
power driver with a hexalobu-
lar TX25 bit
Used for unpacking the system
Safety knife
Used during installation, operation and maintenance
Personal Protective Equip-
ment (PPE)
as required, (e.g., gloves, lab
coats, etc.)
Suitably sized vessels to allow collection of liquid for
10 minutes at maximum flow rate, and a suitably
dimensioned waste system.
Buffer and waste vessels
10
ÄKTAprocess Site Preparation Guide 29-1396-55 AA
2 Site preparation overview