Assign personnel for site
preparation tasks
The site preparation tasks listed in the following table can be assigned to more than one
person at the customer site.
It is recommended that the same people assist the GE service personnel during the
subsequent installation process.
Site preparation tasks
Personnel
Site preparation/
installation
coordinator
•
Review the site preparation guide for safety information and system re-
quirements.
•
Choose the site.
•
Coordinate personnel and tasks.
•
Coordinate the installation timing of the system with any domestic safety
procedures and testings.
•
Order the required materials.
•
Schedule the installation and inform the relevant personnel of the instal-
lation date.
Laboratory personnel/
Primary users
•
Review the safety information.
•
Make sure that all customer-provided materials for the installation are
present at the site.
Facilities personnel
•
Make sure that the installation requirements are met for:
-
Space at the installation site
-
Environmental conditions
-
Biosafety
-
Ventilation and waste collection
-
Electrical supply
-
Safety and installation materials