![GE AKD-8 Operation And Maintenance Manual Download Page 5](http://html1.mh-extra.com/html/ge/akd-8/akd-8_operation-and-maintenance-manual_4006175005.webp)
Remote Racking Operator for AKR Breakers
5
will slide further through the breaker cubicle
door. Rotate the ¼ - turn latch rod counter
clockwise to lock the remote racking operator
to the breaker. Check the latch on the left side
of the remote racking operator to make sure it
is fully engaged into the breaker front cover
(indicated by the label on the latch).
Removing the Remote Racking Operator from
the Small Frame AKR Circuit Breaker.
Hold the remote racking operator securely and
rotate the latch release (located on the left side
of the remote racking operator) clockwise. This
should allow the remote racking operator to be
pulled from the breaker front cover. The
racking screw access covers will close
automatically.
Figure 2
AKR 30/50 Remote Racking Assembly
4 – Hand-Held
Control Box
3 – Start Switch
Push Button
30-foot cable
6- Circuit Breaker
Reset Toggle Switch
AC Plug
5 – IN/OUT
Directional
Toggle Switch
1 –Gear Motor
Housing
7 – ¼ turn latch/rod to
mount to breaker
2 – Square Drive
Coupling To Breaker
8 – Breaker Mounting Clip