background image

Remote Racking Operator for AKR Breakers 

 

              

                                                                          

7

Installation of the AKR 30/50 Remote Racker 

Mounting Bracket Kit – AKR3050EGBRMOD

 

 
When looking at the front of the breaker, locate 
the (2) mounting holes that are already 

punched in the frame on the left side of the 
escutcheon.  They are located behind the 
nameplate on the breaker. 
 
Install the mounting bracket that came with 

your kit.  Align the (2) holes on top of the bracket 
with the (2) holes on the frame.  Install the (2) ¼-

20 flat washers, lock washers and bolts through 

the frame and into the bracket.  Torque the 
bolts to 7 – 10 ft.-lbs.  Do not over torque.  Make 
sure that the flat portion of the bracket with the 
key way is facing outwards.  See picture below.  

After the bracket has been mounted, the 
breaker is ready to be installed into the cubicle. 

 
 

The existing racking screw mechanism needs to 
be inspected for excessive wear and be 
properly lubricated. 

 

 

 

 

 

 

 

 
 
 
 
 
 

Nameplate 

Mounting Bracket 

Figure 4 

 

AKR 30/50 Mounting Bracket Installation 

Summary of Contents for AKD-8

Page 1: ...age Switchgear Remote Racking Operator For AKR Circuit Breakers Cat AKREGRR 115 VAC 60 50 Hertz Operation and Maintenance Manual BCS Switchgear Inc Switchgear Circuit Breakers Parts Tech Support bcssw...

Page 2: ...OF CONTENTS Section 1 Introduction 3 Section 2 Receiving Handling and Storage 3 Section 3 Description 4 Section 4 Modification 10 BCS Switchgear Inc Switchgear Circuit Breakers Parts Tech Support bcss...

Page 3: ...result from rough handling Loose parts associated with the apparatus may be included in the box Care should be taken to make certain that these parts are not overlooked The shipping box will include...

Page 4: ...ng operator to the existing AKR 30 50 and AKR 30s breakers mounting brackets must be added to the breaker On the AKR 30S breaker a mounting bracket must be mounted on the right side of the breaker jus...

Page 5: ...AKR Circuit Breaker Hold the remote racking operator securely and rotate the latch release located on the left side of the remote racking operator clockwise This should allow the remote racking opera...

Page 6: ...f the bolt heads on the breaker frame Be careful not to remove these bolts Slide the bracket behind the lock washers on to the bolts and then retorque the bolts to 25 35 ft lbs Do not over torque Chec...

Page 7: ...the 2 holes on top of the bracket with the 2 holes on the frame Install the 2 20 flat washers lock washers and bolts through the frame and into the bracket Torque the bolts to 7 10 ft lbs Do not over...

Page 8: ...or mounting the remote racking operator to the breaker ATTACHING REMOVING DEVICE Attaching the Remote Racking Operator to the Large Frame AKR Circuit Breaker The circuit breaker must be in the OPEN po...

Page 9: ...turn latch rod to mount to breaker 1 Motor and Gear Housing 6 Circuit Breaker Reset Toggle Switch 5 IN OUT Directional Toggle Switch 4 Hand Held Control Box 3 Start Switch Push Button 2 Square Drive C...

Page 10: ...ch hardware to existing hole of bracket and frame in upper position as shown 3 8 16 Bolt Nut Lock Washer Flat Washer Add 3 8 inch hardware to existing hole in bracket and breaker frame in lower positi...

Page 11: ...AKR 30 Wide Breaker Door with Defeatable Interlock Kit AKR30508EG22DR 800A 1600A AKR 22 Wide Breaker Door Kit AKR30508EG30DR 800A 1600A AKR 30 Wide Breaker Door Kit AKR30508EG22DRDI 800A 1600A AKR 22...

Page 12: ...or each modified breaker door Below is a picture demonstrating how to locate and drill holes in an existing 30S 75 100 or 125 breaker door A picture demonstrating how to locate and drill the holes for...

Page 13: ...emplate above the bottom edge of the door cutout Both press studs will be on the inside of the cutout 3 Drill 1 0 251 diameter hole through the door 2 Drill 1 1 75 diameter hole through the door Figur...

Page 14: ...Remote Racking Operator for AKR Breakers 14 Top of Door Figure 9 Flag Assembly...

Page 15: ...GE Energy Industrial Solutions WavePro EntelliGuard Entellisys Remote Racker GEK 99986 EntelliGuard G Remote Racker DEH 41467 EntelliGuard TU Trip Unit Conversion Kits DET 722 Power Break II into a P...

Page 16: ...ection with installation operation or maintenance Should further information be desired or should particular problems arise which are not covered sufficiently for the purchaser s purposes the matter s...

Reviews: