installation instructions
10
installation instructions
PREPARE THE AiR CONDiTiONER
(continues)
Remove the shipping screws located on
the top of the case.
Remove the ground screws from each
side of the case. Keep it in a safe location.
NOTE: Be sure to save this screw. You will need
them later in the installation.
Slide the air conditioner from the case by
gripping the base pan handle and pulling
forward while bracing the case. Do not
pull or lift on the styrofoam discharge area.
Your unit may come with internal
packaging. This packaging must be
removed prior to installing the air
conditioner back into the cabinet.
3
E
F
FRONT
Do not
pull
or lift
in this
area—
damage
to the
unit may
result
PREPARE THE CASE
Attach the top rail gasket to the bottom
of the top rail.
Install the top mounting rail with 4 type A
screws from the inside of the case. Press
firmly to drive the screws into the gasket
and through the top mounting rail.
Slide each side retainer onto the edge of
each according panel. The figure shows
the orientation of each accordion panel
and side retainer assembly relative to the
case from a top view of the unit.
Slide the left and right accordion panels
into the top and bottom mounting rails.
A
Top mounting rail
B
4
G
H
C
D
WINDOW FILLER PANEL
WINDOW FILLER PANEL
SIDE RETAINER
SIDE RETAINER
Top left
Top right
Bottom mounting rail
Summary of Contents for AEZ24 Series
Page 15: ...15 Notes...
Page 16: ...16 Notes...
Page 33: ...33 Notes...
Page 34: ...34 Notes...
Page 51: ...51 Notas GEAppliances com...
Page 52: ...52 Notas...
Page 53: ...53 Notas GEAppliances com...