Dishwasher Installation
Figure CC
STEP 22: REPLACE TOEKICK
• Place toekick against the legs of the dishwasher.
Attachment
Screws
Toekick
• Align the toekick with the bottom edge and make sure it is
DJDLQVWWKHÀRRU
• Insert and tighten the 2 toekick attachment screws. The
WRHNLFNVKRXOGVWD\LQFRQWDFWZLWKWKHÀRRU
• When reinstalling the toe kick on models with a sound barrier,
ensure that the bottom edge of the rubberized flap is flush
with the floor. Any excess material should be tucked up
behind the outer door. Do not allow excess rubberized flap to
lay on the floor. If any excess is not tucked completely behind
the outer door, it will bunch up between the door and toe kick
and impede proper opening and closing of the door. This will
be noticeable because the door will not stay fully open and
will spring up.
Tip:
Reduce sound from under the dishwasher.
Make sure toekick is against floor.
STEP 23: LITERATURE
• Be sure to leave complete literature package, these
Installation Instructions and product samples and/or coupons
with the consumer.
13
STEP 21: POSITION SOUND BARRIER
AND INSULATION
(on some models)
Skip this step if the sound barrier is not assembled to the
dishwasher.
• Locate the sound insulation package inside the dishwasher.
• Locate the control box.
3HHORȺWKHSDSHUIURPWKHLQVXODWLRQ
• Apply the insulation to the underside of the control box and
ÀXVKZLWKLWVIURQWIDFHDVVKRZQ
Insulation shown adhered to bottom edge of the control
box, flush with the front face, and correctly placed along
dishwasher bottom.
• Remove the masking tape from the sound barrier, and door
front. Re-position the sound barrier over the sound insulation.
Control
Box
Sound
Barrier