Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8 - 77
8-2-32
RFC Assy
8-2-32-1
Tools
•
Common philips screwdrivers
8-2-32-2
Preparations
•
Shut down the system and switch off the main breaker.
8-2-32-3
Removal procedure
1.) Remove the Side Right Cover. Refer to the
8-2-14 "Right or Left Side Cover" on page 8-47
.
2.) Remove the EMI Cover R. Refer to the
8-2-24 "EMI Cover L and R" on page 8-62
.
3.) Unscrew 2 screws (1,2) and eject the PCB. Refer to the Figure 8-118.
4.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-32-4
Mounting Procedure
Install the new parts in the reverse order of removal.
Figure 8-118 RFC Assy
Table 8-33 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test
Debrief Script
“Service Manual, Direction
5245279, Rev 3+, Section 8-2-32. Equipment
passed all required tests and is ready for use. “
Summary of Contents for 5329629
Page 2: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL Page 1 2 ...
Page 9: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SEVICE MANUAL vii JA ZH CN KO ...
Page 22: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL Page 1 10 ...