GE H
EALTHCARE
D
IRECTION
5162630, R
EVISION
3
LOGIQ™ S6 S
ERVICE
M
ANUAL
Section 4-2 - General Procedure
4-3
4.) Press the
ON/OFF
key at the front of the System once.
5.) After initialization is complete, all lighted buttons on the Control Panel light and the default B-Mode
screen or Patient screen (no probes are connected) is displayed on the monitor display.
4-2-2-2
Power Up Sequence
1.) The Start Up Screen will be shown on the Monitor display when the system is turned ON.
4-2-2-3
Entering the Maintenance Mode
Purpose: This is a description on how to enter the maintenance mode.
1.) Insert the service dongle into any USB port.
2.) Wait for scanner boot-up.
3.) Tap ON/OFF the power switch.
Figure 4-12 Power On/Off Standby Switch Location
ON/OFF Switch