GE 076080 Installation And Start-Up Manual Download Page 9

Not for 

Reproduction

9

Carbon Monoxide (CO) Detector/ Smoke Detector

 

      Carbon Monoxide (CO) detector(s) installed and in working 

order.

 

      Smoke detector(s) installed and in working order.

Placement

 

     Required permits have been obtained.

 

     Generator placed in an area free from Carbon Monoxide 

(CO) buildup. See 

Placement of Standby Generator to 

Reduce the Risk of Carbon Monoxide Poisoning

.

 

     Generator placed in an area compliant to NFPA 37. See 

Placement of Standby Generator to Reduce the Risk of 
Fire

.

 

     Generator placed in an area free from water damage. See 

Other General Location Guidelines

.

 

     Generator placed in an area free from utility and other 

systems. See 

Other General Location Guidelines

.

 

     Generator placed in a debris free zone. See 

Other General 

Location Guidelines

.

 

      Generator placed on flat ground with provisions for water 

drainage. See 

Other General Location Guidelines

.

Fuel

 

     Generator is connected to fuel source with steel flexible fuel 

line, has no fuel leaks and conforms to local codes. See 

The 

Gaseous Fuel System

.

 

     Proper fuel pressure has been measured with all gas 

appliances operating. See 

The Gaseous Fuel System

.

 

     Fuel system has been configured for the proper fuel supply: 

Natural gas (NG) or liquefied petroleum ( LP). See 

Fuel 

Conversion

.

 

       Fuel type: (circle one)      

NG     LP

 

       Fuel pipe size used: (circle one)    

3/4”    1”    1-1/4”      1-1/2” 

See NFPA 54, Chapter 6.

 

       Fuel pressure at fuel inlet port with generator on and at 

full load and all gas appliances turned on and operating

 

____________________.

Electrical

 

     Generator neutral is connected to Automatic Transfer 

Switch. See 

Generator AC Connection System

.

 

     

Generator is grounded

. See Grounding the Generator and 

NFPA 70 (NEC), Article 250.35B.

 

     Generator is connected to the transfer switch with the 

specified wiring. See 

Utility Circuit Connection

 

and

 

Transfer Switch Communication

.

 

     Generator is connected to the transfer switch with the 

specified wiring. #18AWG twisted pair wiring from the 

generator control panel to the transfer switch is installed 

in a separate conduit from high voltage wires unless the 

insulation rating on all wiring is rated for 600V. See 

Transfer 

Switch Communication

.

 

     Dipswitches in most transfer switches must be set to 

correspond to the wattage of the generator. See 

Transfer 

Switch Operator/Installation Manual.

Operation

 

     Cold Weather Kit is installed in temperatures below 30°F 

(-1°C). 

See Cold Weather Kit.

 

     Correct battery type is installed and fully charged. See 

Final 

Installation Considerations

.

 

     Generator engine oil level is at full mark. See 

Final 

Installation Considerations

.

 

     Coolant is full.

 

     Circuit breaker is in the ON position. 

 

     Utility was shut off to test the operation of generator and 

transfer switch. Note any fault codes and make corrections 
as required

.

 

     AC Voltage Output___________________________.

 

     Frequency Output___________________________.

Installation Checklist - GE Generator Systems

Proper installation of the generator requires the completion of the following tasks:

Owner Information

Name: _____________________________________________
Address:  ___________________________________________
___________________________________________________

Phone/e-mail: _______________________________________

Unit Information

Generator Model: ____________________________________
Generator Serial Number: _____________________________

Installing Contractor Information

Name: _____________________________________________
Address:  ___________________________________________
___________________________________________________

Phone/FAX: _________________________________________

Electrician:  _________________________________________
Signature: __________________________________________

Plumber:  ___________________________________________
Signature:   _________________________________________

Inspector Information

Name: _____________________________________________
Address:  ___________________________________________
___________________________________________________

Title: _______________________________________________
Inspection Date: _____________________________________

This generator has been installed per the manufacturer’s 

instructions:

Installing Contractor Signature:  ______________________________
Date: ____________________________________________________

Summary of Contents for 076080

Page 1: ...ual Generator Systems 30 000 Watt Generator System Model 076080 This generator is rated in accordance with UL Underwriters Laboratories 2200 stationary engine generator assemblies and CSA Canadian Sta...

Page 2: ...scomfort or inconvenience Save these original instructions for future reference This standby generator requires professional installation before use The installer should follow the instructions comple...

Page 3: ...r to REDUCE THE RISK OF CARBON MONOXIDE POISONING 11 Other General Location Guidelines 12 Placement of Standby Generator to REDUCE THE RISK OF FIRE 13 Electrical and Fuel Inlet Locations 15 The Gaseou...

Page 4: ...fy yourself that it is safe for you and others You must also make sure that the procedure work method or operating technique that you choose does not render the generator system unsafe Fire Toxic Fume...

Page 5: ...e physically or mentally fatigued Before performing any maintenance on the generator disconnect the battery cable indicated by a Negative NEG or first When finished reconnect that cable last After you...

Page 6: ...he original parts WARNING Hot pressurized coolant could cause serious injury DO NOT open radiator cap when hot Before servicing allow coolant to cool CAUTION Installing the 15 Amp fuse could cause the...

Page 7: ...fire fighting operations Every effort has been made to ensure that information in this manual is accurate and current However we reserve the right to change alter or otherwise improve the product and...

Page 8: ...nting pad Connecting wire and conduit Fuel supply valves plumbing Two 2 AA batteries for remote wireless monitor Carbon monoxide detector s Smoke detector s Two 60 lengths of 2 Schedule 40 pipe NOT co...

Page 9: ...oltage wires unless the insulation rating on all wiring is rated for 600V See Transfer Switch Communication Dipswitches in most transfer switches must be set to correspond to the wattage of the genera...

Page 10: ...us injury headache fatigue dizziness vomiting confusion seizures nausea or fainting Operate this product ONLY outdoors in an area that will not accumulate deadly exhaust gas Keep exhaust gas away from...

Page 11: ...y occupied building or structure By law it is required in many states to have a Carbon Monoxide CO detector in operating condition in homes and other structures occupied by people Carbon monoxide dete...

Page 12: ...cture Other General Location Guidelines Place the standby generator in a prepared location that is flat and has provisions for water drainage Install the standby generator in a location where sump pum...

Page 13: ...ny structure overhang or trees DO NOT place weatherproof enclosure under a deck or other type of structure that may confine airflow USE ONLY flexible fuel line provided Connect provided fuel line to g...

Page 14: ...Installations with Structure Without a Fire Rating NOTICE The figures below show the minimum installation distances allowed to structures and items listed in legend C Standby weatherproof enclosure m...

Page 15: ...cm centers or 8 ga steel wire fabric 6 15 cm centers Attach unit to slab at four corner locations A with minimum 5 16 8 mm diameter masonry anchor bolts long enough to secure the unit The fuel inlet...

Page 16: ...ped paint with supplied touch up paint Lifting the Generator The generator weighs approximately 1 086 pounds 493 kg Proper tools equipment and qualified personnel should be used in all phases of handl...

Page 17: ...the components located behind them are listed below A Roof Control Panel internal guard B Front Access Panel oil drain and oil filter C Internal Guard air filter oil dipstick coolant bottle D Rear Ac...

Page 18: ...to the unit 3 Lift up on panel and secure with tab on roof latch To secure internal guard 1 Move holding tab on roof latch to release the panel then lower the panel into place 2 Secure the panel with...

Page 19: ...B supplied between the generator Fuel Inlet port A and rigid piping to prevent thermal expansion or contraction from causing excessive stress on the piping material A union C or flanged connection sh...

Page 20: ...icated by a Negative NEG or 8 Remove the rear panel 9 Locate the fuel selector collar on bottom of fuel regulator 10 Carefully push up on fuel selector collar twist either right or left and slide thro...

Page 21: ...ese conditions that use power management technology must have their transfer switch programmed appropriately for this power decrease Fuel Pipe Sizing There are numerous on line or otherwise published...

Page 22: ...tatus panel accessory 6154 E Eight Pin Terminal Block Used to connect signal wires to the control board Connect only one wire per terminal F Power Connection Line 1 and Line 2 Power connection to tran...

Page 23: ...d 33 forms the neutral lead as shown schematically and as wiring diagram A complete schematic and wiring diagram can be found later in this manual Neutral is not bonded to ground at generator When mak...

Page 24: ...ox to the fuse terminals B in the automatic transfer switch Use National electric code for correction factors and wire size calculations The generator must be installed as part of a system that includ...

Page 25: ...outage OFF Turns off running generator prevents unit from starting and resets any detected faults OFF must be pressed and held for more than 5 seconds in order to reset service codes MANUAL Used to ma...

Page 26: ...ODE IF A UTILITY POWER OUTAGE IS SENSED THE SYSTEM WILL START THE GENERATOR WHEN UTILITY POWER IS RESTORED AUTO LETS THE ENGINE STABILIZE INTERNAL TEMPERATURES SHUTS OFF THE GENERA TOR AND WAITS FOR T...

Page 27: ...o update or change these settings follow the steps below ok ok SET DATE If set to OFF display will read EXERCISE CYCLE OFF or YEAR FLASHING MONTH FLASHING DAY FLASHING SET TIME HOURS FLASHING MINUTES...

Page 28: ...tton The following will scroll across the digital display and then move to the next item Run time Date Time Exercise Cycle date and start time The user can press the LEFT ARROW or RIGHT ARROW at any t...

Page 29: ...en working in the Advanced Settings menu Exercise caution when selecting and verifying parameters for the generating set and region where the generating set is being operated Confirm all settings befo...

Page 30: ...truction Wet lead acid Terminal Type Top post type battery Dimensions MAX BCI size 26R Install the battery as described in Servicing the Battery in the Maintenance section of the operator s manual Alw...

Page 31: ...ngine to run roughly for a few minutes 6 Listen for unusual noises vibration or other indications of abnormal operation Check for oil leaks while engine runs 7 Let engine warm up for about 5 minutes t...

Page 32: ...that the generator is ready in case of a utility power outage During the exercise period the generator runs for approximately 20 minutes performs a diagnostic check then shuts down The exercise cycle...

Page 33: ...age occurs The generator will only enter the exercise cycle if the unit is in the AUTO mode and this exact procedure is followed To set the exercise timer NOTICE The generator is set with a default ex...

Page 34: ...ed generator ready system update 1 low battery voltage 2 low fluid level 3 under over voltage 4 engine does not start part 316196 fcc id MCQ XBS2C IC id 1846A XBS2C 5 low frequency 6 engine overspeed...

Page 35: ...follow Steps 3 through 6 DEALER NAME DEALER PHONE generator power service needed generator ready system update 1 low battery voltage 2 low fluid level 3 under over voltage 4 engine does not start par...

Page 36: ...or will display the current state The monitor will try to link for 1 minute This step can only be completed when the generator is in Linking Mode 6 Once the link has been confirmed press the OK button...

Page 37: ...een LED will flash every 7 seconds The green LED indicates that the generator is supplying power SERVICE NEEDED When active the red LED will flash in a sequence that corresponds to the service code Fo...

Page 38: ...ect the entire installation carefully Be sure to fill out the Installation Checklist on Page 9 This completes the installation and start up instructions The Operator s Manual provides full details on...

Page 39: ...N o t f o r R e p r o d u c t i o n 39 Notes...

Page 40: ...N o t f o r R e p r o d u c t i o n 40 Schematic Diagram...

Page 41: ...N o t f o r R e p r o d u c t i o n 41 Schematic Diagram continued...

Page 42: ...N o t f o r R e p r o d u c t i o n 42 Wiring Diagram...

Page 43: ...N o t f o r R e p r o d u c t i o n 43 Wiring Diagram...

Page 44: ...mpany and is under license by Briggs Stratton Power Products Group LLC Copyright 2013 All rights reserved No part of this material may be reproduced or transmitted in any form without the express writ...

Page 45: ...ww 4manuals cc http www manual lib com http www 404manual com http www luxmanual com http aubethermostatmanual com Golf course search by state http golfingnear com Email search by domain http emailbyd...

Reviews: