GDZX ZXJYD-II Manual Download Page 1

ZXJYD-II Insulating Oil 

Breakdown Voltage Tester

Summary of Contents for ZXJYD-II

Page 1: ...ZXJYD II Insulating Oil Breakdown Voltage Tester ...

Page 2: ... 1 Contents Ⅰ Product Description 2 Ⅱ Features 2 Ⅲ Technical parameter 2 Ⅳ Panel introduction 3 Ⅴ Operating Steps 4 Ⅵ Precautions 8 Ⅶ Fault code and removal 9 Ⅷ Cup cleaning 9 Ⅸ Annex list 10 ...

Page 3: ...cup no oil leakage 5 Unique high voltage sampling instrument design allows test values directly into the A D converter to avoid errors in analog circuits and measurement results more accurate 6 Over voltage over current limit and grounding alarm functions 7 Portable easy to carry convenient to use inside or outside doors Ⅲ Technical Parameter 1 Booster capacity 1 5 kVA 2 Booster speed 0 5 kV s 1kV...

Page 4: ...t 6 Cup lid of the test cell 7 Temperature and humidity sensor 8 Ground column 9 power supply 10 power switch 11 Safety sign of high voltage 1 LCD show date time operating parameter test result menu 2 Function keys select and set up operating parameter 3 Print print test result and average value test result ...

Page 5: ... Ground column connect ground column of reliability 9 power supply plug in power cord of AC 220V 50Hz 10 power switch control tester power on off 11 safety sign of high voltage a triangle Ⅴ Operating Steps 1 Plug the power cord in and turn the power switch on LCD display start work Figure 2 Figure 2 boot screen 2 figure 2 On the boot screen press setup and enter into lower level frame Figure 3 Fig...

Page 6: ...2002 press OK to enter the GB 2002 settings subpage The operation is the same as the GB1986 subpage refer to the relevant content of Article 3 5 In the Figure 3 move the cursor To 14 press OK to enter the time setting subpage Figure 5 Figure 5 Time setting subpage To press Opt and move cursor to the year month and day location press or to choise the right time Press OK to return boot screen Figure...

Page 7: ...econds with no breakdown the result of MTV will be the breakdown voltage of the electric insulating oil 5 Breakdowns Default 6 rang 1 6 the increment Δ 1 After the choice press OK to start testing 7 In Figure 3 press Opt move cursor to manual press OK you will see need password you can contact with us to tell you press the print or display button enter the oil sample single hit Figure 2 press the ...

Page 8: ...ress Print your will see the last test result date Press Opt No 1 test result date will show on the LCD Figure 8 In the Figure 8 press Opt No 2 result date will show on the LCD Figure 9 Other data display Figure 10 11 12 are in accordance with the above operation on the line Figure 8 Figure 9 Figure 10 ...

Page 9: ...ill be miss press Print key will print the LCD test result date Press OK will back to the boot screen Figure 2 Ⅵ Precautions 1 Please read the operation manual carefully before sart test 2 The operators should know the knowledge of the electrical equipment and the analytical instrument 3 Instrument can be used inside and outside the door but must to avoid the rain corrosive gas dusts of high conce...

Page 10: ...t shut 3 No breakdown voltage boot normally Check the MTV opt maximun test voltage 4 No show after breakdown Check test cell clean the cell 5 No Print Check if there is paper in printer 6 Put on paper we have put the paper in the printer If paper is done you must put new Operating instruction 1 Press circle key on the printer front lip 2 Put paper into printer Keep enough paper out of the printer ...

Page 11: ...ample to be washed and wash for 2 3 times Ⅸ Annex list No Name Quantity 1 Host 1 2 Oil cup 1 3 Stirring paddle 2 4 Standard gauge 1 5 Power cord 1 6 3A fuse 2 7 Tweezers 1 8 Printing paper 1 9 Manual 1 10 Test Report 1 11 Certificate warranty card 1 ...

Reviews: