Abbreviated Installation Instructions
(For those who don't have time!)
S l i d i n g G a t e O p e r a t o r s
GDS “L” 450, 630 Range
Made in Australia from Australian & quality imported components
Place operator in correct position (Pinion wheel to be parallel to
the gate and stepped out to allow for width of rack once it is
mounted onto the gate frame). Mark out fixings and fix operator
to the concrete pad.
Fix rack to the gate frame keeping 1mm-2mm clearance between the
rack teeth and Pinion wheel
Once the rack is fixed move the gate and sight the rack moving
over the pinion wheel, check that most of the pinion wheel
meshes with the rack. Make sure rack runs freely over the
pinion wheel, any tights spots should be corrected by adjusting
the rack height. Check the operator is firmly bolted down to
the concrete pad.
Ensure stops are installed on the gate for the fully closed and fully
open positions.
Mount Control box, connect motor cable and Limit cable
between controls and operator. Connect required P.E Beams
Limit cable. Adjust Limits to actuate prior to gate end
positions. Connect Power supply. Turn on Power.