Installation
T-EA-5100-1-GB-07-08
15
Installation
4.
Installation
Figures 4.1 and 4.2 show a typical Aqualine liquid ring
pump system completely installed. Other arrangement
versions are also possible.
4.1
System setup with cooler in main flow
Fig. 4.1
Components of a system with liquid ring pump – Cooler in main flow
13
5
15
14
17
15
2
18
18
15
16
6
7
3
4
8
1
9
5
19
12
15
14
10
11
20
min
max
Details see page 17
1
Liquid ring pump
2
Vacuum filter
3
Venting line
4
Non-return valve
5
Bellow
6
Safety valve
7
Pressure gauge
8
Thermometer
9
Operating water tank
10
Four-way directional control
valve
11
Safety dome and float valve
12
Vehicle tank
13
Operating water cooler
14
Water stop valve
15
Drain valves (see Fig. 4.3)
16
Safety bowl with float valve
17
Flexible mounting
18
Vacuum gauge
19
Floating switch
20
Water inlet for filling system
21
Leak water return line
(optional)
Summary of Contents for AQUALINE 1200
Page 1: ...Installation Instructions AQUALINE 1200 T EA 5100 1 GB 07 08...
Page 2: ......
Page 4: ...Table of contents 4 T EA 5100 1 GB 07 08...
Page 10: ...Technical data 10 T EA 5100 1 GB 07 08...
Page 14: ...Transport 14 T EA 5100 1 GB 07 08...
Page 26: ...Start up Operation Maintenance Spare parts 26 T EA 5100 1 GB 07 08...
Page 29: ...Index T EA 5100 1 GB 07 08 29...
Page 31: ...T EA 5100 1 GB 07 08 31...
Page 32: ...32 T EA 5100 1 GB 07 08...