background image

 Start-up / Operation / Maintenance / Spare parts

T-EA-5100-1-GB-07-08

25

Start-up / Operation / Maintenance / Spare parts

5.

Start-up / Operation / Maintenance / Spare parts

Information on start-up, operation, mainte-
nance and replacement parts lists have been
compiled in a separate operator manual.

Summary of Contents for AQUALINE 1200

Page 1: ...Installation Instructions AQUALINE 1200 T EA 5100 1 GB 07 08...

Page 2: ......

Page 3: ...3 Point of installation and fastening 18 4 4 Connections and piping 18 4 5 Protection against intake of dirt and residue 19 4 5 1 Suction line 19 4 5 2 Vacuum filter 19 4 5 3 Safety dome 19 4 5 4 Safe...

Page 4: ...Table of contents 4 T EA 5100 1 GB 07 08...

Page 5: ...These Operating Instructions contain all required infor mation and have been written for those in charge of the unit The machine will give smooth service for a long time provided these Instructions a...

Page 6: ...l volume becomes smaller As a result of this the enclosed air is compressed and pushed out of the pressure outlet The cells are charged and drained through openings in the housing cover located on the...

Page 7: ...ure power consumption on shaft m3 h barg kW at 1000 min 1 650 0 0 18 at 1500 min 1 1 050 0 0 38 at 1800 min 1 1 220 0 0 57 At 1 000 mbar absolute intake pressure volume flow rate final gauge pressure...

Page 8: ...ditional ventilation G 1 1 2 Betriebswasser Anschlu G 1 1 2 Connection for the liquidring fluid G 1 1 2 Betriebswasser Entleerung G 3 4 Drain for the liquidring fluid G 3 4 536 5 21 122 475 18 701 644...

Page 9: ...e and prop shaft by Vee belt whereby the Vee belt pulley is installed on the free shaft end by pneumatic clutch By hydromotor by diesel engine or electric motor by flexible clutch For more details see...

Page 10: ...Technical data 10 T EA 5100 1 GB 07 08...

Page 11: ...ns preventing damage to the machine Symbol for potentially explosive atmosphere Here the symbol draws attention to provisions or information which must be observed if the machine is used in a potentia...

Page 12: ...the pressure gauge vacuum gauge reading On the vehicle Close the stop slide valve Bleed or vent the pressure line between the system and the stop slide valve Relieve elevated pressure manually at the...

Page 13: ...move transport safeguards where provided 3 2 Storage Store the machine in a dry and heated room until in stallation Remove the covers on suction and pressure openings only at the time of actual instal...

Page 14: ...Transport 14 T EA 5100 1 GB 07 08...

Page 15: ...18 15 16 6 7 3 4 8 1 9 5 19 12 15 14 10 11 20 min max Details see page 17 1 Liquid ring pump 2 Vacuum filter 3 Venting line 4 Non return valve 5 Bellow 6 Safety valve 7 Pressure gauge 8 Thermometer 9...

Page 16: ...tential bonding between the equipment and the truck The safe operation of the vacuum pump in a potentially explosive atmosphere requires that all safety instructions in our operating instruc tions and...

Page 17: ...n line to suction side R 1 8 connection Fig 4 3 Components of a system with liquid ring pump Cooler in main flow detail 15a1 15b 15c 15a2 15a1 Drain valve for the liquid ring fluid 15a2 Drain valve fo...

Page 18: ...achine The various possibilities of the suction and pressure line connections are illustrated in Fig 4 5 for machines of clockwise and counter clockwise rotation see also Fig 1 1 The suction and press...

Page 19: ...he liquid level directly sufficient calming space is available the filter element does not dip into the liquid also filters with non absorbing texture become satu rated due to the capillary action of...

Page 20: ...am the pressure socket For this install a pipe coupling R 1 2 The immersion depth of the thermometers must be equivalent to one half the diameter of the pipe The indicating range of the thermometers m...

Page 21: ...id ring pump requires a constant supply of operating fluid For this the casing cover of the machine have a connec tion see dimension sheet If the piping has sufficiently low resistance depending on pi...

Page 22: ...rops The axial thrust of the drive must not be trans ferred to the rotor shaft Install the drive components on the rotor shaft using the available thread M16 Do not attempt to install the drive compon...

Page 23: ...ect when the ready installed and tensioned belt can be deflected by the pressure of the thumb by 16 to 20 mm for every 1000 mm axial distance Vee belt drive with electric motor is not allowed because...

Page 24: ...l screws loosely 2 Push the pulley with the bush on the shaft align and uniformly tighten the screws Removal 1 Take out the screws install one as a forcing screw in the half thread hole in the bush an...

Page 25: ...rts T EA 5100 1 GB 07 08 25 Start up Operation Maintenance Spare parts 5 Start up Operation Maintenance Spare parts Information on start up operation mainte nance and replacement parts lists have been...

Page 26: ...Start up Operation Maintenance Spare parts 26 T EA 5100 1 GB 07 08...

Page 27: ...Heat to be dissipated 21 I Installation 15 Installation of the Vee belt drive 23 Intake 19 Intake pressure 7 Intended purpose 11 Isothermal 6 L Liquid ring machines 6 Liquid Ring Pump 5 Lubricating p...

Page 28: ...ical data 7 Transport 13 Transport safeguards 13 Type code 6 U Use for intended purpose 11 V Vacuum 7 Vacuum filter 19 20 Vacuum gauge 20 Vee belt 23 Vee belt tensioning 23 venting valve 9 Volume flow...

Page 29: ...Index T EA 5100 1 GB 07 08 29...

Page 30: ...l information contact your local representative or Gardner Denver Drum Ltd PO Box 178 Springmill Street Bradford West Yorkshire UK BD5 7YH Tel 44 0 1274 718100 Fax 44 0 1274 718101 Email wittig sales...

Page 31: ...T EA 5100 1 GB 07 08 31...

Page 32: ...32 T EA 5100 1 GB 07 08...

Reviews: