28
Removal and installation of Tool Carriage
Refer to Fig 1-4 and following steps to remove the Tool Carriage.
Step 1. Remove the Top Cover.
Step 2. Unplug the Flat Cable from Carriage PCB.
Step 3. Remove the Carriage Cover (Push down the cover’s top, then pull it downward).
Step 4. Loosen the screws of the Small Roller (lower) about 2~3 revolutions to release the Carriage.
Step 5. Unscrew both DU rollers and remove them.
Step6. To remove the Tool Carriage, tilt and pull down. Be careful not to damage the Carriage PCB.
Carriage PCB
Carriage Guide Beam
Carriage Cover
DU roller
Blade Holder Screw
Fig 1-4
Small Roller
Summary of Contents for Expert Pro Series
Page 4: ...4 Main Unit Assembly 29006178G ...
Page 7: ...7 Left End Assembly 7 1 ...
Page 9: ...9 Right End Assembly 7 8 ...
Page 13: ...13 Complete X motor Assembly 29003820G ...
Page 15: ...15 Y Axis Idel Pulley Assembly 29003820G ...
Page 17: ...17 Pinch Roller Assembly 29001437G 4 1 8 ...
Page 19: ...19 Grid Drum Assembly 29005441G ...
Page 22: ...22 1 System Diagram and Components of Main Board ...