Step 5
Fix the corners with 2x 50mm
screw as shown in diagram.
Do not secure the building to the
floor until the roof is fitted. Fix
the panels onto the floor using
50mm screws in alignment with
the floor joists
2
6
6
Step 7
ASSEMBLE RIDGE BAR
Position the two parts of the ridge bar within the ‘U’
channel and secure from either side with 3 x 30mm
screws and 4 x 30mm screws from underneath.
Secure an ‘L’ bracket to either end of the ridge bar
using 2 x 30mm screws per bracket.
10
22
23
30mm
screw
10
22
50mm
screw
4
16 x 50mm screws
Place the roof support bar in
between the front and back panels.
Ensure the top corners of the
support bar are ush with each top
point. Secure in place using the L
Bracket on each end with 4x30mm
screws.
Step 6
Fix door gable and Plain sides
using same method shown in
step 5.
Position the panels so there is
equal spacing between the oor
and cladding on all four sides.
2
50mm
screw
1
30mm
screw
22
15 x 30mm screws
5
5
22 x 50mm screws