W1610.1207-18.EN.doc WEB VERSION
3
STEP #4
Set polycarbonate exposed side on the outside over horizontal left guide I-3, use one (1) Rr-3 panel, one (1)
P-3 joint and one (1) Ss-3 panel, then do the right side with one (1) Tt-3 panel, one (1) Q-3 joint and one (1)
Uu-3 panel over the J-3 horizontal panel. Secure P-3 and Q-3 to I-3 and J-3 respectively with self-tapping
screws (PQ-3).
NOTE:
Once the wall track is in place,
apply silicone along the top of the
wall track and at the joint of the
two tracks.
Silicone is not
supplied.
ASSEMBLE PIECES
BEFORE SCREWING
THEM TO THE WALL
STEP #3
Assemble ML-3, N-3, O-3, and MR-3 as shown and
position evenly above vertical guides, with the top fo
the track at 96’’ from the ground. Secure wall track
and vertical tracks to brick or cement wall by drilling
through the aluminum and using screws Xx-3. Insert
the 2 horizontal guides, I3 & J3 at the top of the
frame. Make sure the 2 frames are at the correct
level, if not, use shims to compensate. Do not use
tools to force.