4
ZZZ-204.43224.1207-18.GP.EN.SUN
WEB VERSION
SUN-HI
Step 7:
Ins
tall the flashings “Q”, “R”, “S”,
and “S-2” onto the beam assembly,
using screws “Qq” on the inside.
The notched end of a flashing will
always go in a corner of the
gazebo.
Step 8:
Install the curtain rails “T” and “U” on the inside of the beam assembly using bolts “Pp”.
Pp