ZZZ-202.43202.0114-21.GP.EN.doc WEB VERSION
8
Step 5
:
1. Attach Mounting B
rackets “O” and “P” to Rafters “M” and “N” respectively. Use threaded hole
about 8 ½
” & 5” from end of rafter.
2. Lift Central H
ub “L” to a height of about 110” (2.79m) at the center of the gazebo. (Caution: this
part may be heavy, use support as needed)
3. Attach one end of R
after “M” to the hub using 2 Bolt “Pp”. Attach other end with Mounting
Bracket to the corner of the beam assembly with 2 B
olts “Pp”. Use the set of holes closest to
the inside.
Repeat with remaining “M” Rafters.
4. Similarly, attach one end of R
after “N” to the hub using 2 Bolt “Pp”. Attach other end with
Mounting Bracket to the beam assembly with 2 S
crews “Qq”. Use the set of holes closes to the
inside.
Repeat with remaining “N” Rafters.
Step 6:
1. Once all rafters are in
place, install top cap “K”
over central hub “L”. Use
flat washers and acorn nuts
“Vv” to secure tightly.
Pp
Pp
Pp