89
www.gateway.com
3
Fold out the handle and push the green locking lever to the right to release the power
supply module from the chassis (front or back, whichever is applicable).
4
Pull the power supply module straight out of the server with the handle.
5
Insert the new power supply module into the server, with the green locking lever to
the left, until it locks into place, then fold the handle flat.
6
Reconnect the AC power cord for the new power supply module.
7
If you added a redundant power supply module, see
.
Locking lever
Handle
Power supply LED
8510522.book Page 89 Wednesday, March 16, 2005 11:19 AM
Summary of Contents for 9415
Page 1: ...User Guide Gateway 9415 Server ...
Page 5: ...iv www gateway com 8510522 book Page iv Wednesday March 16 2005 11 19 AM ...
Page 121: ...116 www gateway com 8510522 book Page 116 Wednesday March 16 2005 11 19 AM ...
Page 145: ...140 www gateway com 8510522 book Page 140 Wednesday March 16 2005 11 19 AM ...
Page 171: ...166 www gateway com 8510522 book Page 166 Wednesday March 16 2005 11 19 AM ...
Page 187: ...182 www gateway com 8510522 book Page 182 Wednesday March 16 2005 11 19 AM ...
Page 188: ...A MAN 9415 USR GDE R0 03 05 ...