![background image](http://html1.mh-extra.com/html/gates/z3-housing/z3-housing_setup-use-and-care-manual_3762239035.webp)
Z3 Setup
Page 35
Mount
Stackable Port Rings (SPR’s) and Port
✓
SPR’s are assembled in any order on the housing
. Place the lock pin on the first
SPR in the ‘lock’ position.
✓
Lubricate O-Rings
as necessary for smooth, easy rotation.
✓
Start by mating the first SPR to the Port Base with the locking pin at the top
.
Mate the SPR to the housing fully, then rotate 90 degrees until the lock pin ‘snaps’
into place.
TIP
: Perform this procedure from the rear of the housing, pulling toward you to mate
SPR’s and Ports.
✓
Mate the next SPR with the lock catch at the top,
and rotate 90 degrees until the
lock pin ‘snaps’ into place.
Lock Pin in
lock position
Release position
1
2
Pro Action Shown
Lock Catch