Z3 Setup
Page 11
✓
Stackable Port Ring (SPR).
Remove the SPR’s one at a time or as a group. The
lock pin is shown below in the locked and release position.
✓
With the SPR’s unlocked,
rotate 90 degrees and separate
.
Lock position
Release position.
1
2
Pro Action Shown.