![Gates MC3001 Operating And Calibration Instructions Download Page 15](http://html1.mh-extra.com/html/gates/mc3001/mc3001_operating-and-calibration-instructions_3759260015.webp)
USER GUIDE - MC300
1
1
5
-
Completely close the die-carriers.
-
From front of machine, lubricate between the die-carriers and the face flange
(lubrication point N° 3 - see figure 10).
Figure 10 :
Lubrication point N° 3.
Recommended grease:
see above.
- From the rear of the bell housing,
spray
the grease all around the cone (lubrication point N° 2 - see figure 9).
Figure 9 :
Lubrication point N° 2.
Recommended grease:
see above.
4.1.2 - CHECKING AND REPLACING THE OIL:
- Regularly check the oil level — about every 500
crimping operations.
- Empty the oil tank each year and replace the used oil with new oil (the machine is delivered with a full tank of
hydraulic oil type ISO HV 32).
4.1.3 - CLEANING THE SWAGING HEAD:
(DISCONNECT FROM POWER SUPPLY)
- Regularly dismantle the face flange and the die-carriers — about every three months. This is necessary to
ensure that metallic/other particles are removed before causing damage to machine parts.
Dismantle as follows:
- Put die set N° 35 into location 1
, Fig. 5,
with dies reversed so that they protrude past the face flange.
- Remove gauge setting mechanism - the crimper must be fully opened.
- Remove the 12 cap head screws from the face flange.
- Carefully remove the flange with the 8 die-carriers.
- Clean and lubricate all surfaces using recommended grease.
- Re
assemble
the flange and the die-carriers. Ensure that it is correctly located for the gauge setting mechanism.
- Tighten the 12 screws with a torque wrench
set
at 28 MKg. (
T
ighten
opposing screws, spreading the force,
This operation can be difficult for an inexperienced mechanic.
When in doubt, don’t hesitate to contact your Gates representative.
thus reducing the possibility of deforming the flange.)