19
RECEI
VER
LEARN
2nd LIMIT
S4
ALM
CHAR
GING
PWR IN
GT
O R
CVR.
WHT
BLU
BRN
ORG
RED
BLK
GRN
WHT
BLU
BRN
ORG
RED
BLK
GRN
COM
GRN
BLK
RED
CYCLE
SAFETY
EXIT
SHADOW
OPEN
EDGE
COM
AU
X
R
LY
MASTER OPER
A
TOR
2ND OPER
A
TOR
C
ONTR
OL INPUT
S
CLOSE
EDGE
1
2
3
4
5
6
7
WHT
BLU
BRN
ORG
RED
BLK
GRN
MASTER OPER
A
TOR
7
WHT
BLU
BRN
ORG
RED
BLK
GRN
COM
CYCLE
SAFETY
COM
MASTER C
ABLE
C
ONTR
OL INPUT
S
Correct
Wire
Terminal
Block
Wrong
Wrong
Exposed strands
of wire
Screwed into
wire insulation
8
Secure wires in terminals.
Insert 7 wires into corresponding color terminals.
CAUTION: Please
call your power company
before you dig. Failure to
do so could cause injury
or even death.
10
Top View
Min 3 Ft
Max 1,000 Ft
GTO Transformer
Mounts Here
9
Locate power outlet and identify wire path to control box.
NOTE: If OUTLET is OUTSIDE use weatherproof cover.
Dig trench and lay wire from AC power source to control box.
Use only 16 guage stranded, low voltage, PVC sheathed wire
(RB509). NOTE: DO NOT use telephone wire or solid core wire.
NEVER splice wires together.
Transformer Wiring Installation
If using optional solar panel charger instead of transformer, go to page 22.
IMPORTANT: Do not connect both solar panel and transformer.
Control Box Installation
Control Box Installation
Summary of Contents for Silver-HD Single
Page 43: ......