background image

!

 

 

The volume of your room must be equal to at least 0,6 m3 per each kW of the heat output of 

your device. Practically you can estimate 1 m3 per each kW, for instance, for a device with 
heat output of 24 kW, the volume of the room must be 24m3. 

!

 

 

For supplying air for the room where your device is placed, an orifice must be made. (min 

100cm2). The orifice must be made in a position both outside and inside the wall. Materials 
which may obstruct the air flow should not be placed in front of the orifices. 

!

 

 

These orifices must be preserved with unique grilled covers and no materials that may obstruct 

the air flow must be put in front of it. 

!

 

 

The air orifice must be on the wall or above the window. (As shown in the figure) .The orifice 

below must be close to the floor and the orifice above must be close to the ceiling. 

!

 

 

Or as it can be seen in the figure, one bottom orifice of minimum 150 m2 must be opened.  

1. INSTALLING AND PLACEMENT 

1.1. Mounting the “B” Type Wall Hung Boilers with Flue Duct 

Caution: The mounting area and waste gas duct connection must conform the instructions 

designated by Turkish Standards Institute and authorized bodies. 

The wall hung boilers with flue ducts must not be mounted to areas with less than 8 m3 of 

volume and bedrooms, balcony, dusty environments, stairwells and random empty areas in 

the building. 

The waste gases that form due to combustion in wall hung boilers are exhausted by means of the 

flue duct. Since the use of such devices at areas with air inlets and flue ducts not conforming the 

specifications are dangerous for human life, the Gas Company does not permit the use of gas. 

 

 

The volume of your room must be equal to at least 0,6 m3 per each kW of the heat 

output of your device. Practically you can estimate 1 m3 per each kW, for instance, for a 
device with heat output of 24 kW, the volume of the room must be 24m3. 

 

 

For supplying air for the room where your device is placed, an orifice must be made. 

(min 100cm2). The orifice must be made in a position both outside and inside the wall. 
Materials which may obstruct the air flow should not be placed in front of the orifices.

 

 

These orifices must be preserved with unique grilled covers and no materials that may 

obstruct the air flow must be put in front of it. 

 

 

The air orifice must be on the wall or above the window. (As shown in the figure) .The 

orifice below must be close to the floor and the orifice above must be close to the ceiling. 

 

 

Or as it can be seen in the figure, one bottom orifice of minimum 150 m2 must be 

opened. EXAMPLE: ENABLING THE SPACE FOR AIR INLET 

!

 

9

Summary of Contents for BAYKAN Series

Page 1: ...ix 30kW Sun Premix 35kW Sun Premix Our highly esteemed customers We would like to thank you for your trust in our company Baykan and your decision for purchasing products of Baykan Our devices have be...

Page 2: ...CONTENTS 1 WARNINGS PAGE 3 2 TECHNICAL DATA PAGE 6 3 INSTALLING PAGE 8 4 ADJUSTMENT AND MAINTENANCE PAGE 15 5 USAGE PAGE 19 2...

Page 3: ...Bayklan Main Service Headquarters and Baykan Authorized Technical Services provide the installation adjustment and maintenance works of your wall hung boilers Your boiler has been manufactured for pur...

Page 4: ...operate using electricity and gas Open the windows and doors Do not touch the electricity switches Do not smoke Immediately inform the Authorized Institution Your Local Gas Distribution Company and a...

Page 5: ...International Directives and Regulations Your device is certified by Turkish Standarts Institute TSI Certificate Number Your device is CE certified CE Certificate Number The device is in conformity w...

Page 6: ...temperature G20 20mbar 105 1 105 7 105 5 Class 107 2 107 5 107 5 Nox Type C 53 4 48 2 49 1 CENTRAL HEATING Central Heating System Water Temperatu Expansion Tax Capacity C 30 80 Expansion Tank Pressure...

Page 7: ...NECTIONS Width mm 400 Height mm 700 Depth mm 330 362 394 Weight kg 37 39 41 CH circuit inlet outlet in DHW inlet outlet mm 60 100 Gas circuit m 90 Dirsek 3 5 Flue pipe diameter m 90 Dirsek 0 5 Flue pi...

Page 8: ...in the building The waste gases that form due to combustion in wall hung boilers are exhausted by means of the flue duct Since the use of such devices at areas with air inlets and flue ducts not confo...

Page 9: ...st not be mounted to areas with less than 8 m3 of volume and bedrooms balcony dusty environments stairwells and random empty areas in the building The waste gases that form due to combustion in wall h...

Page 10: ...said spaces can be provided by keeping a wide space between door and floor EXAMPLEINDIRECT NATURAL VENTILATION EXAMPLE FOR AIR CIRCULATION THAT ARISES DUE TO THE DIFFERENCE OF DENSITY If air flow is...

Page 11: ...surements given in the figure Hang your wall hung boiler to hanging screws 2 2 WATER AND GAS CONNECTIONS Before starting the procedures related with water connections we recommend you to wash the inst...

Page 12: ...sure that the Gas pipe is clean clean around it The building internal gas distribution pipe must conform to the technical specifications and regulations An elastic connection between the device and in...

Page 13: ...ot liable for the damages which may arise due to non standard electricity connection and grounding maps As electricity cables use NYM 3x1 5 mm2 Phase Neutral soiling Use a 3 Amper fuse CAUTION CONNECT...

Page 14: ...LING THE WATER FOR CENTRAL HEATING SYSTEM After connecting electricity gas and water connections start filling the water for central heating system and circuit This procedure must be performed with ca...

Page 15: ...the label ADJUSTMENT AND MAINTENANCE 1 ADJUSTMENTS CAUTION ALL PROCEDURES AND OPERATIONS DEFINED IN THIS SECTION OF THE MANUAL MUST BE PERFORMED BY QUALIFIED PROFESSIONALS APPARATUS ADJUSTMENT In ord...

Page 16: ...unter clockwise MINIMUM CAPACITY Disconnect a connector of gas valve modulator meanwhile hold the nut shown with B still adjust the minimum pressure by tightening the screw A for increasing the pressu...

Page 17: ...ion on the process card between 1 2 LPG circuits see figure nr 5 Ensure that the pressure on the boiler is min 25 and max 35 bars for butane gas and min 25 to max 37 mbar for Propane furthermore you s...

Page 18: ...bstances that form due to burning MAINTENANCE WORKS Cleaning the growing coverings that may form on exchangers and electrodes Getting rid of the oxidation that may form on boiler Opening the device tu...

Page 19: ...st be performed by qualified professionals The said person must check that the data on the plate and all adjustment elements and set ups are in conformity with the specified use of the device Always c...

Page 20: ...r a long period of time turn off the main gas supply tap and cut the electricity leading to the wall hung boiler The wall hung boiler is controlled by a device against freezing on its control card the...

Reviews: