GasTech BAYKAN Series User Manual Download Page 13

!

 

 

The proper sealed and hermetic gaskets must be used for spacing connection. 

!

 

 

Inspect and compare the gas inlet pressure values and the gas inlet values of the 

building. These adjustments are only performed by Baykan Service Headquarters and 

Baykan authorized personnel. 

!

 

 

Do not forget to let the air in the gas pipe out.  

NOTE: When the conversion from natural gas to L.P.G. is being performed, the burner jets 
suitable for L.P.G. must be changed. The gas inlet pressure should not exceed 60mbars. 

ENSURE THAT THE GAS AND WATER CONNECTING PIPES HAVE NOT BEN USED FOR 
GROUNDING PURPOSES. IN SUCH CASES, DO NOT OPERATE THE WALL HUNG BOILER. 
DISCONNECT THE GROUNDING. SITUATIONS DANGEROUS FOR YOUR DEVICE MAY ARISE 
AT SUCH CASES. 

2.3 ELECTRICITY CONNECTION 

The supply cable of your device is delivered to you as connected to the unit. The external 
electricity connection of the cable must be made by a qualified electrician in conformity with the 
regulations and standards in effect. 

The manufacturer company is not liable for the damages which may arise due to non- 
standard electricity connection and grounding maps. 

!

 

As electricity cables, use NYM 3x1,5 mm2 Phase, Neutral, soiling. 

!

 

Use a 3 Amper fuse. 

CAUTION: CONNECT YOUR DEVICE TO BIPOLAR SOCKETS. 

Do not operate your device with multiple sockets and adapters.

If the electricity cables need to be replaced, the cables having the same properties and 
specifications must be used. If there is a need for changing the cable, comply with the signs on the 
main input connector. 

!

 

Please connect the blue cable to the connector marked with ‘N’.

!

 

Connect the brown cable to the connector marked with letter ‘L’.

!

 

Connect the yellow/green cable to the connector signed with grounding sign. 

!

 

While changing 

the cable, use the specified cables, H05VVF,H05-VVH2-F 

2.4 ROOM THERMOSTAT CONNECTION 

!

 

 

Have the room thermostat connection of the device you purchased from Baykan or delivered to 

you with the device serviced by authorized technical service personnel. Connect the cable 
from the room thermostat to the poles of connectors seen in diagram 7 correctly. 

!

 

 

In case of connecting the external probe, connect the cable from outdoor thermostat to the 

poles of connectors seen in diagram 7. 

!

 

13

Summary of Contents for BAYKAN Series

Page 1: ...ix 30kW Sun Premix 35kW Sun Premix Our highly esteemed customers We would like to thank you for your trust in our company Baykan and your decision for purchasing products of Baykan Our devices have be...

Page 2: ...CONTENTS 1 WARNINGS PAGE 3 2 TECHNICAL DATA PAGE 6 3 INSTALLING PAGE 8 4 ADJUSTMENT AND MAINTENANCE PAGE 15 5 USAGE PAGE 19 2...

Page 3: ...Bayklan Main Service Headquarters and Baykan Authorized Technical Services provide the installation adjustment and maintenance works of your wall hung boilers Your boiler has been manufactured for pur...

Page 4: ...operate using electricity and gas Open the windows and doors Do not touch the electricity switches Do not smoke Immediately inform the Authorized Institution Your Local Gas Distribution Company and a...

Page 5: ...International Directives and Regulations Your device is certified by Turkish Standarts Institute TSI Certificate Number Your device is CE certified CE Certificate Number The device is in conformity w...

Page 6: ...temperature G20 20mbar 105 1 105 7 105 5 Class 107 2 107 5 107 5 Nox Type C 53 4 48 2 49 1 CENTRAL HEATING Central Heating System Water Temperatu Expansion Tax Capacity C 30 80 Expansion Tank Pressure...

Page 7: ...NECTIONS Width mm 400 Height mm 700 Depth mm 330 362 394 Weight kg 37 39 41 CH circuit inlet outlet in DHW inlet outlet mm 60 100 Gas circuit m 90 Dirsek 3 5 Flue pipe diameter m 90 Dirsek 0 5 Flue pi...

Page 8: ...in the building The waste gases that form due to combustion in wall hung boilers are exhausted by means of the flue duct Since the use of such devices at areas with air inlets and flue ducts not confo...

Page 9: ...st not be mounted to areas with less than 8 m3 of volume and bedrooms balcony dusty environments stairwells and random empty areas in the building The waste gases that form due to combustion in wall h...

Page 10: ...said spaces can be provided by keeping a wide space between door and floor EXAMPLEINDIRECT NATURAL VENTILATION EXAMPLE FOR AIR CIRCULATION THAT ARISES DUE TO THE DIFFERENCE OF DENSITY If air flow is...

Page 11: ...surements given in the figure Hang your wall hung boiler to hanging screws 2 2 WATER AND GAS CONNECTIONS Before starting the procedures related with water connections we recommend you to wash the inst...

Page 12: ...sure that the Gas pipe is clean clean around it The building internal gas distribution pipe must conform to the technical specifications and regulations An elastic connection between the device and in...

Page 13: ...ot liable for the damages which may arise due to non standard electricity connection and grounding maps As electricity cables use NYM 3x1 5 mm2 Phase Neutral soiling Use a 3 Amper fuse CAUTION CONNECT...

Page 14: ...LING THE WATER FOR CENTRAL HEATING SYSTEM After connecting electricity gas and water connections start filling the water for central heating system and circuit This procedure must be performed with ca...

Page 15: ...the label ADJUSTMENT AND MAINTENANCE 1 ADJUSTMENTS CAUTION ALL PROCEDURES AND OPERATIONS DEFINED IN THIS SECTION OF THE MANUAL MUST BE PERFORMED BY QUALIFIED PROFESSIONALS APPARATUS ADJUSTMENT In ord...

Page 16: ...unter clockwise MINIMUM CAPACITY Disconnect a connector of gas valve modulator meanwhile hold the nut shown with B still adjust the minimum pressure by tightening the screw A for increasing the pressu...

Page 17: ...ion on the process card between 1 2 LPG circuits see figure nr 5 Ensure that the pressure on the boiler is min 25 and max 35 bars for butane gas and min 25 to max 37 mbar for Propane furthermore you s...

Page 18: ...bstances that form due to burning MAINTENANCE WORKS Cleaning the growing coverings that may form on exchangers and electrodes Getting rid of the oxidation that may form on boiler Opening the device tu...

Page 19: ...st be performed by qualified professionals The said person must check that the data on the plate and all adjustment elements and set ups are in conformity with the specified use of the device Always c...

Page 20: ...r a long period of time turn off the main gas supply tap and cut the electricity leading to the wall hung boiler The wall hung boiler is controlled by a device against freezing on its control card the...

Reviews: