background image

Wood Fired Boiler

Gasogen

29 - 93kW

User Operating Instructions

Summary of Contents for G3 50 2S

Page 1: ...Wood Fired Boiler Gasogen 29 93kW User Operating Instructions...

Page 2: ...e according to the foreseen scopes it is necessary to carefully follow the instructions indicated in this manual 3 WATER TREATMENT The hardness of the mains water supply conditions the frequency with...

Page 3: ...ustment and servicing of this appliance must be carried out by a competent quali fied person and installed in accordance with the current standards and regulations Failure to correctly install this ap...

Page 4: ...the switch in the I position the boiler is connected to the mains electricity supply green led light illuminated and is ready to operate The recycle pump functions Mode selection keys With the switch...

Page 5: ...about 65 C within the foreseen time control timer the fan and re cycling pump will be turned off Panel connected to the mains electricity supply but the boiler is not running Therefore repeat the lig...

Page 6: ...sure If it is an open circuit system the pressure does not have to be restored as this occurs automatically via the water level regu lator inside the water tank If it is a sealed circuit system refer...

Page 7: ...g this switch you can connect or disconnect the boiler from the mains electricity supply With the switch in the 0 position the boiler is not switched on green led light off With the switch in the I po...

Page 8: ...he upper loading door has been closed With the switch 22 it is possible to select the operation mode wood or the back up gas or oil fired boiler Place the switch into the 0 position wood firing mode N...

Page 9: ...or disconnect the sy stem pump boiler load from the mains electrical system With the switch in the 0 position the system pump is not switched on With the switch in the II position the system pump is...

Page 10: ...u can connect or disconnect the fan from the mains electrical system Set the switch in the I position the fan is powered electrically but it will not run It will start running only after the upper loa...

Page 11: ...ce the plastic cap The safety thermostat can intervene in case of boiler tempera ture overheating You can avoid this happening by lowering the working thermostat see above If the boiler s safety therm...

Page 12: ...st be placed as previously described 6 3 CHECKSTO CARRY OUT BEFORE FIRING THE BOILER Before firing the boiler carry out the following checks Check that the On Off gas valve positioned upstream of the...

Page 13: ...ore the quantity of wood burnt whilst the secondary air completes the combustion P Primary air box S Secondary air box 1 Metal ring air adjuster P S 1 S1 P1 S S P P1 C USEFUL SUGGESTIONS and LOADING E...

Page 14: ...noisy excess of primary air P The flame must not be too small lack of primary air P If the ash does not falls down properly increase the pri mary air P If too much ash falls down reduce the primary ai...

Page 15: ...aused by the wood s moisture content and the way the boiler is used PRECAUTIONS TO TAKE DURING BOILER OPERA TION After every air adjustment wait 5 to 10 minutes before making a new adjustment Once the...

Page 16: ...loading Every week Remove carefully all the residues of combustion accumula ted in the fire box Clean with the brush supplied the triangular passes of the combustion chamber Remove the ashes from the...

Page 17: ...ushing rod when the loading door is opened In this way the smoke accumulated in the firebox is aspirated and sent to the chimney directly The bypass in conclusion allows the smoke to be discharged at...

Page 18: ...sed for long periods see paragraph 6 7 Use thicker wood logs Use up all the wood before loading a new batch Problem The boiler does not reach the requested temperature The flame is small and there is...

Page 19: ...er does not remain unused for long periods see paragraph 6 7 Use bigger logs Use up all the wood before loading a new batch Problem The boiler does not reach the requested temperature The flame is sma...

Page 20: ...9 5 6 8 7 8 7 1 2 4 3 10 2 1 2 4 3 9 10 2 6 5 8 7 Spare parts GASOGEN G3 25 2S GASOGEN G3 40 2S GASOGEN G3 50 2S GASOGEN G3 65 2S GASOGEN G3 80 2S Gasogen 20...

Page 21: ...Spare parts GASOGEN G3 25 2S GASOGEN G3 40 2S GASOGEN G3 50 2S GASOGEN G3 65 2S GASOGEN G3 80 2S 14 11 13 12 15 16 17 21...

Page 22: ...12 26955 Stone cast iron bars insulation kit 13 26956 Stone cast iron bars insulation kit X X 13 12350 Cast iron bars insulation kit 14 12352 Cast iron bars insulation kit X X X X PUC0420 Triangular...

Page 23: ...ing Pty Ltd ABN 90 446 545 923 51 Assembly Tullamarine Vic 3043 Australia PO Box 356 Tullamarine Vic 3043 Australia 61 3 9330 3300 61 3 9310 5655 sales automaticheating com au Telephone Facsimile Emai...

Reviews: