12
Step 7
a) Take out the U burner (F) with igniting needle pre-assembled already, make sure the igniting needle is pointed
right to the small gas hole of the U burner (F).
b) Put the U burner (F) through the hole of the bowl, connect it with the Main Valve (S). Make sure the valve nozzle
is inserted to the U burner.
c) Align the hole of U burner (F) with the burner support (Q), insert 2pcs M6x12 bolts (AA) into the pre-drilled holes
separately and screw them tightly.
d) Insert the ignition wire to the main valve. (As the fig showed in magnified below)
Step 8
a) Align the hole on the Up Right Hinge (M) with the hole on the Lid (A).
b) Screw 2pcs M4x12 bolt (BB) to the pre-drilled hole along with one washer (EE) and lock each by M4 nut (DD).
Tighten by screwdriver.
c) Do it again with the Up Left Hinge (N).