Gasboy 2600A Installation Instructions Manual Download Page 5

MDE-4863 Gasboy® 9800A or 2600A Pump Interface Kits Installation Instructions · October 2009

Page 5

Installation of the 9800A/2600A Pump Interface Kit

Installation of the 9800A/2600A Pump Interface Kit

Installing these kits involves DC wiring to the Fuel Management System. Read the MDE-4341 
Series 9800A/9800Q Pump and Dispenser Installation/Operation Manual and your Fuel 
Management System Installation Manual before you proceed. Also refer to 

Figure 7

 on 

page 10

 an

Figure 8

 on 

page 11

.

To install the Pump Interface Kits, proceed as follows:

1

Turn off the Circuit Breakers that supply power to the MICRO, LIGHTS, and FEED.

2

Unlock and remove the front panel.

Figure 1: Unlocking the Front Panel

Unlock

3

Remove the two bolts located over the tabs of the Bezel Assembly. Lift the Bezel Assembly 
upwards and out to remove.

Figure 2: Removing the Bolts on the Front Panel

Bolts

Summary of Contents for 2600A

Page 1: ...1 Jumper Settings 9 Required Tools The following tools are required for the installation of the kits Phillips Screwdriver Wrench Parts List The following table lists the parts included in the Pump Int...

Page 2: ...Start up Service Manual Gasboy Atlas Pumps Dispensers MDE 4341 Series 9800A 9800Q Pump and Dispenser Installation Operation Manual Gasboy Atlas Pumps Dispensers Abbreviations and Acronyms Term Descrip...

Page 3: ...work Follow the Regulations Applicable information is available in National Fire Protection Association NFPA 30A Code for Motor Fuel Dispensing Facilities and Repair Garages NFPA 70 National Electric...

Page 4: ...nt a health hazard if not handled correctly Ensure that you clean hands after handling equipment Do not place any equipment in the mouth In an Emergency Inform Emergency Personnel Compile the followin...

Page 5: ...ation Operation Manual and your Fuel Management System Installation Manual before you proceed Also refer to Figure 7 on page 10 and Figure 8 on page 11 To install the Pump Interface Kits proceed as fo...

Page 6: ...uctions October 2009 4 Loosen and remove if necessary the two screws located on the left and right door support brackets and pivot the Display Panel down Figure 3 Removing the Screws on the Front Pane...

Page 7: ...washers onto the threaded end of the standoffs Screw the standoffs on the platform base see Figure 5 Note Newer platforms will have two pre fixed standoffs in which case the loose washers and standoff...

Page 8: ...he DC Conduit Assembly Attach the DC Cable to P1 of the Pump I F PCB P1 is a 4 pin connector Ensure that you align Pin 1 of the Cable Connector with Pin 1 of the P1 Connector If present Pin 5 of the C...

Page 9: ...se out I F see Figure 8 on page 11 The chart below shows the jumper settings and wires to connect to in the Junction Box based on the configuration Check JP1 JP3 jumpers and change them if necessary T...

Page 10: ...009 Jumpers JP4 and JP5 When this board is used in a model A or Q pump dispenser or 9850K jumpers JP4 and JP5 are set to the Q A position Figure 7 illustrates the proper output for using a Pump I F Bo...

Page 11: ...ilable only for 9800A or 9800Q single pumps dispensers Figure 8 Dual channel Single hose Pulse out I F Note 1 All wiring and conduit runs must conform with all building fire codes all Federal State an...

Page 12: ...a registered trademark of The Phillips Screw Co 2009 GASBOY 7300 West Friendly Avenue Post Office Box 22087 Greensboro North Carolina 27420 Phone 1 800 444 5529 http www gasboy com Printed in the U S...

Reviews: