6
anita-b
GP-510-143
4
Inserting needles
Caution !
Switch off the main switch and remove your feet from the pedals on the machine support
before replacing needles so that the machine may not be started by unintended treading on
the pedal.
Fig.3
Having chosen the right thickness (size) of needle whose system coresponds to the prescribed
kind (usually 134 LR) loosen screw (A,fig.3) on needle bar and insert needle (B) as far as it will
go, i.e. up to the bottom of the needle hole in the needle bar. Turn the needle so that the recess
above the needle eye facs the looper point. Caution – when a greater needle size has ben chosen
it is necessary to check if the looper point does not catch the needle – a possible adjustment of
looper position must be carried out by an autorised person. Make sure that the needle passes
through the middle of the stitch plate opening. If it is not the case, check up if the needle is not
bent. Replace the defective needle.
5 Replacing Hook Bobbin, Threading Hook Thread
The thread passes from the bobbin case (A) through slot (B) under spring (C) into the looper
(fig. 4) in such a way that the thread will be unwound from the bobbin in the direction of the
arrow. Hold a thread end of ca. 5-6 cm and insert the bobbin case containing bobbin into the
hook in such a way so that the thread can be unwound from the bobbin smoothly. Lock the
bobbin case (A) in the looper using the lock (E).
Fig.4
Fig.5
Use screw (fig. 5) to adjust fhe tension of the thread unwound from the bobbin. Turn it in the
(+) direction to increase the thread tension or in the (-) direction to decrease the tension.
www.garudan.cz
Summary of Contents for GP-510-143
Page 2: ...2 w w w g a r u d a n c z...
Page 14: ...14 anita b Frame and Cover Parts A1 GP 510 143 w w w g a r u d a n c z...
Page 16: ...16 anita b Upper Shaft Mechanism B GP 510 143 w w w g a r u d a n c z...
Page 18: ...18 anita b Lower Shaft and Clutch Mechanism C1 GP 510 143 w w w g a r u d a n c z...
Page 20: ...20 anita b Timing Belt Driving Mechanism C2 GP 510 143 w w w g a r u d a n c z...
Page 22: ...22 anita b Lower Feed Mechanism D2 GP 510 143 w w w g a r u d a n c z...
Page 24: ...24 anita b Feed Shaft Mechanism D3 GP 510 143 w w w g a r u d a n c z...
Page 26: ...26 anita b Stitch Adjuster Mechanism D4 GP 510 143 w w w g a r u d a n c z...
Page 28: ...28 anita b Needle Bar Feed and Presser Foot Mechanism E GP 510 143 w w w g a r u d a n c z...
Page 30: ...30 anita b Thread Take Up Lever Mechanism F GP 510 143 w w w g a r u d a n c z...
Page 32: ...32 anita b Roller Presser Foot Mechanism G1 GP 510 143 w w w g a r u d a n c z...
Page 34: ...34 anita b Presser Foot Bar Mechanism G2 GP 510 143 w w w g a r u d a n c z...
Page 38: ...38 anita b Right Side Hook Post Mechanism I1 GP 510 143 w w w g a r u d a n c z...
Page 40: ...40 anita b Left Side Post Mechanism I3 GP 510 143 w w w g a r u d a n c z...
Page 42: ...42 anita b Needle Feed and Driven Roller Mechanism K1 GP 510 143 w w w g a r u d a n c z...
Page 48: ...48 anita b Telescopic Shaft Driven Roller Mechanism K4 GP 510 143 w w w g a r u d a n c z...
Page 50: ...50 anita b Upper Shaft Driven Roller Mechanism K5 GP 510 143 w w w g a r u d a n c z...
Page 52: ...52 anita b Rods Lower Backtacking Mechanism K6 GP 510 143 w w w g a r u d a n c z...
Page 54: ...54 anita b Hand Lever Backtacking Mech anism K7 GP 510 143 w w w g a r u d a n c z...
Page 56: ...56 w w w g a r u d a n c z...
Page 58: ...58 anita b Accessories N2 GP 510 143 w w w g a r u d a n c z...
Page 60: ...60 w w w g a r u d a n c z...