
4
anita-b
GP-510-141
2
Putting the machine into operation
Following instructions must be observed to avoid risk of failures or damage to the
machine:
- clean the machine of preserving agents
- drop 1-2 drops of oil into looper
- remove the front cover and oil the ends of needle bar connecting-rod and of the cross-head
slide of thread take-up.
- a specialist shall check if the electrical equipment is in good order incl. necessary voltage
for motor and see to it that machine hand wheel rotates towards the operator (see arrow)
when the electric motor is connected.
-do not run the machine at full speed during the first two weeks, sewing should be performed
at ca. 3/4 of the maximum speed.
Caution!
Do not interfere with the electric equipment of the machine, call an electrician. Danger of
electrical accident. When working on the machine or close to the machine take care that
you do not give cause to an accident. See to it that no liquid can get into the electrical
equipment and cause a short-circuit or any other failure of the electrical equipment.
Observe the generally valid safety regulations.
When running the machine, be very cautious especially near the needle, trimming knives,
thread take-up and cloth pressing elements.
When the machine head is tilted on its support, take special care so that the whole machine
and support may not tilt over.
To tilt the machine into working position take the head with both hands to avoid any injury
between the tilted machine and the base plate.
Summary of Contents for GP-510- 141
Page 2: ...2...
Page 14: ...14 anita b Frame and Cover Parts Thread Tension Mechanism A1 GP 510 141...
Page 16: ...16 anita b Upper Shaft Mechanism B GP 510 141...
Page 18: ...18 anita b Lower Shaft and Clutch Mechanism C1 GP 510 141...
Page 20: ...20 anita b Timing Belt Driving Mechanism C2 GP 510 141...
Page 22: ...22 anita b Needle Feed and Driven Roller Mechanism D1 GP 510 141...
Page 24: ...24 anita b Lower Feed Mechanism D2 GP 510 141...
Page 26: ...26 anita b Feed Shaft Mechanism D3 GP 510 141...
Page 28: ...28 anita b Stitch Adjuster Mechanism D4 GP 510 141...
Page 30: ...30 anita b Needle Bar Feed and Presser Foot Mechanism E GP 510 141...
Page 32: ...32 anita b Thread Take Up Lever Mechanism F GP 510 141...
Page 34: ...34 anita b Roller Presser Foot Mechanism G1 GP 510 141...
Page 36: ...36 anita b Presser Foot Bar Mechanism G2 GP 510 141...
Page 38: ...38 anita b Right Side Hook Mechanism H1 GP 510 141...
Page 40: ...40 anita b Right Side Hook Post Mechanism I1 GP 510 141...
Page 42: ...42 anita b Left Side Post Mechanism I3 GP 510 141...
Page 45: ...45 anita b Accessories N2 GP 510 141...
Page 47: ...47...