background image

 

Pipe/Tubing Length

 

 

Dia. (in.) 

Min. Length ( in./mm ) 

Max. Length ( in./mm ) 

 

 

 

2

1

/

2

 

8/203 

36/914 

8/203 

36/914 

3

1

/

2

 

8/203 

36/914 

8/203 

36/914 

4

1

/

2

 

8/203 

36/914 

8/203 

36/914 

10/254 

28/711 

 

Pipe Set-Up 

1. Pipe or tubing longer than the specified maximum lengths listed in Chart above must be supported 

with 2 pipe stands. The second pipe support should be located 3/4 of pipe length from roll groover. 

Failure to use two stands may result in the unit tipping or the pipe falling. 

2. Raise upper groove roll housing by placing pump release lever in RETURN position. 

3. Square pipe and pipe support to roll groover making sure pipe is flush against drive roll flange. 

4. Level pipe by adjusting pipe stand. 

 

NOTE! If running machine in forward, offset pipe 1/2° away from operator. 

 

NOTE! If running machine in reverse, offset pipe 1/2° toward operator.   

Groove depth adjusting 
 
1.  Lock the release valve by rotating the knob clockwisely.   
 
 
 
 
 
 
 
 
 
 
 
 
 
Fig 1 
 
2. Position the depth adjusting nut to top position, mount the pipe to knurling roll. Swing up and 
down the pump handle to actuate the upper roll, until it touches the pipe surface (make sure the 
roll touches the pipe surface entirely). 
 
 
 
 
 
 
 
 
 

Upper roll touches the 
pipe entirely. 

Lock the release valve 

Summary of Contents for RG6C

Page 1: ...CHINE MODEL RG6C WARNING Read this Operators Manual carefully before using this machine Failure to understand and follow the contents of this manual may result in electrical shock fire and or serious...

Page 2: ...act with grounded surfaces There is an increased risk of electrical shock if your body is grounded Don t expose electrical tools to rain or wet conditions Water entering a tool will increase the risk...

Page 3: ...e pipe Do not reach inside pipe end Will prevent being cut on sharp edges and burrs Be sure groover is properly secured to the power drive or threading machine Carefully follow the setup procedures Pr...

Page 4: ...y placing pump release lever in RETURN position 3 Square pipe and pipe support to roll groover making sure pipe is flush against drive roll flange 4 Level pipe by adjusting pipe stand NOTE If running...

Page 5: ...37 3 083 216 6 109 280 3 1 2 083 226 All dimensions are in inches NOTE Groove diameter should be measured using a Diameter tape Periodically check groove with a Diameter Tape or similar measuring devi...

Page 6: ...o fast Slow down pumping action Refer to proper operating instructions Pipe is too hard Replace pipe Pipe drifts back and forth on driving roll axis while grooving Pipe length not straight Use straigh...

Page 7: ......

Page 8: ...R R Bramley Co Ltd P O Box 14 114 Panmure Auckland NZ 09 579 2936 www bramley co nz Garrick Herbert Pty Ltd P O Box 3118 Kirrawee NSW 02 9545 6633 www garrickherbert com au AUSTRALIA NEW ZEALAND...

Reviews: