Magnum 6K16-Series Managed Fiber Switch Installation and User Guide (04/06)
37
www GarrettCom com
.
.
Step 5.
Once the latching
connectors are aligned
properly and the mounting
holes are aligned with
stand offs then press
slowly and firmly with two
fingers (as shown below in
Fig. 3.6.2f) on the top of
the latching connectors
until the connectors
latched up securely.
Figure 3.6.2f: Securely latching up 6KPM Cards into a Magnum 6K16-Series
NOTE: All 6KPM slots need not be filled in order for the Magnum 6K16-Series unit to
be operational. When leaving 6KPM slots empty, always use a face plate (Magnum
6K8-BLNK) to cover the slot opening in the front panel. This will maintain proper
cooling air flow, safety, and operation as required by FCC, CE, and other regulations.
Step 6.
Now screw down the daughter board with 6 #440 screws, so that it holds the
daughter board securely. The figure below shows the top view of 6KPM card
after successfully
installing the 6KPM
cards inside the
Magnum 6K16-Series.
Fig. 3.6.2g
Top View :
6KPM Module installed inside
a 6K16-Series
Step 7.
Once the installation of
granddaughter and
daughter modules is
done, the front panel screen plates need to be placed on the front of the chassis
cover to complete the installation process for that port module. The front panel
screen plate comes along with the package of port module separately along with
3 brackets and 6 #256 flat head screws. The brackets and screws have been