Page iv
GTX 327 Installation Manual
Revision K
Preliminary
190-00187-02
PARAGRAPH
PAGE
5
POST INSTALLATION CONFIGURATION & CHECKOUT PROCEDURE ..............................5-1
5.1
Operation
..........................................................................................................................................5-1
5.2
Configuration Pages
........................................................................................................................5-4
APPENDIX A CERTIFICATION DOCUMENTS
A.1 Continued Airworthiness .................................................................................................................. A-1
A.2 Environmental Qualification Forms, GTX 327 Transponder ........................................................... A-1
APPENDIX B ASSEMBLY AND INSTALLATION DRAWINGS
APPENDIX C INTERCONNECT DRAWINGS