Important:
Study and follow the diagram carefully.
a.
Feed the bolt end of the 2700mm Upper cable
(49)
up through opening in Upper frame
(2)
. Insert Ø22
x 15mm Pulley bushings
(63)
into holes and attach 1st Pulley
(71)
using M10 x 60mm Allen bolt
(29)
and M10 Aircraft nut
(42)
.
b.
Repeat procedure for 2nd Pulley, feeding cable up through opening in Upper frame
(1)
.
c.
Attach 3rd Pulley to Upper frame
(2)
using a M10 x 42mm Allen bolt
(31)
, 2 x Ø10mm Washers
(41)
,
M10 Aircraft nut
(42)
and 1 x L-Shaped separation blade
(22)
.
d.
Place 4th Pulley
(71)
onto the cable and fit Pulley covers
(46)
over Pulley and cable. Attach Pulley
assembly to Floating pulley bracket
(10)
using a M10 x 40mm Allen bolt
(32)
, 2 x Ø10mm Washers
(41)
and M10 Aircraft nut
(42)
.
Step 12
Assembly instructions
20
31