
14
8. Installation / Mounting Instructions
CAUTION: THIS UNIT IS SEALED (INCLUDING THE BATTERY). THE COVER IS NOT REMOVABLE!
Once the steps to setup the wireless alarm network have been completed, please proceed to the following
installation steps.
1. To obtain aesthetic alignment of the alarm with the hallway or wall, the “A” line on the mounting bracket
should be parallel with the hallway when ceiling mounting or horizontal when wall mounting.
2. After selecting the proper smoke alarm location as described in Section 6, attach the mounting bracket to the
ceiling as shown in
Figure 8A
. For wall mounting see
Figure 8B
. Place the mounting plate on the wall; be sure
the “A” line is horizontal (parallel to the floor). Use the screws and anchors provided to secure the mounting
bracket (use 3/16” drill bit for anchors).
3. This alarm has a battery permanently sealed inside the alarm; No battery installation is necessary.
Align the alarm with the mounting plate and rotate clockwise (right) until the unit stops and clicks into place.
•
Install the alarm fully on the mounting bracket by rotating the alarm in a clockwise direction.
NOTE:
The alarm will mount to the plate in four (4) positions (every 90 degrees).
The alarm is now activated! After installation/activation, test your alarm as described in Operation and Testing section.
WARNING : FAILURE TO PROPERLY INSTALL AND ACTIVATE THIS ALARM WILL PREVENT
PROPER OPERATION OF THIS ALARM AND WILL PREVENT ITS RESPONSE TO FIRE HAZARDS.
Figures 8 C
Figures 8 B
When mounting
in a hallway, the
“A” line should
be parallel with
the hallway.
Alignment Marks
(”A” Line) on
Mounting
Bracket
When wall
mounting, the
“A” line should
be horizontal.
Remove
Install
A
Figures 8 A